The challenges of estimating potential output in real time
Robert W. Arnold
Review, 2009, vol. 91, issue Jul, 290 pages
Abstract:
Potential output is an estimate of the level of gross domestic product attainable when the economy is operating at a high rate of resource use. A summary measure of the economy's productive capacity, potential output plays an important role in the Congressional Budget Office (CBO)'s economic forecast and projection. The author briefly describes the method the CBO uses to estimate and project potential output, outlines some of the advantages and disadvantages of that approach, and describes some of the challenges associated with estimating and projecting potential output. Chief among these is the difficulty of estimating the underlying trends in economic data series that are volatile, subject to structural change, and frequently revised. Those challenges are illustrated using examples based on recent experience with labor force growth, the Phillips curve, and labor productivity growth.
Keywords: Economic conditions; Economic development (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)
Downloads: (external link)
https://files.stlouisfed.org/files/htdocs/publications/review/09/07/Arnold.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:fip:fedlrv:y:2009:i:jul:p:271-290:n:v.91no.4
Access Statistics for this article
Review is currently edited by Juan M. Sanchez
More articles in Review from Federal Reserve Bank of St. Louis Contact information at EDIRC.
Bibliographic data for series maintained by Scott St. Louis ().