Grid and bear it
Phil Davies
Fedgazette, 2007, vol. 19, issue Nov, 10-14
Abstract:
We all pay dearly when congestion chokes the electrical system. A resurgence of transmission investment in the district promises relief?if new lines actually get built.
Keywords: Electric utilities; Electricity; Federal Reserve District, 9th; Energy industries (search for similar items in EconPapers)
Date: 2007
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.minneapolisfed.org/publications_papers/pub_display.cfm?id=1165
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:fip:fedmga:y:2007:i:nov:p:10-14:n:v19no.6
Access Statistics for this article
More articles in Fedgazette from Federal Reserve Bank of Minneapolis Contact information at EDIRC.
Bibliographic data for series maintained by Jannelle Ruswick ( this e-mail address is bad, please contact ).