Using System Dynamics Method to Measure Project Management Performance of Local Government Agencies

Carlos M. Chang (), Johanes Makahaube, Adeeba A. Raheem, Eric Smith and Syeda Lamiya Mahnaz
Additional contact information
Carlos M. Chang: Department of Civil and Environmental Engineering, Florida International University, 10555 W. Flagler Street, EC124, Miami, FL 33199, USA
Johanes Makahaube: Research Consultant, El Paso, Texas, TX 79902, USA
Adeeba A. Raheem: Department of Civil Engineering, University of Texas at El Paso, El Paso, Texas, TX 79968, USA
Eric Smith: Department of Industrial, Manufacturing, and Systems Engineering, University of Texas at El Paso, El Paso, TX 79968, USA
Syeda Lamiya Mahnaz: Department of Civil and Environmental Engineering, Florida International University, 10555 W. Flagler Street, EC124, Miami, FL 33199, USA

Businesses, 2022, vol. 2, issue 4, 1-20

Abstract: Measuring project management performance is complex and requires tools to capture the dynamic nature of the processes involved. Since the conception of system dynamics in the 1950s, the method has been used to solve complex projects. Project management possesses dynamic characteristics that involve planning, human resources, implementation, and control elements; thereby, using system dynamics to measure project management performance is a realistic approach. A research study was conducted using system dynamics to develop project management performance measures to capture the complexity of the process in local government agencies. The research approach considers measuring project engineering management performance as a holistic system influenced by leadership involvement, project management processes, and project engineering manager’s ability. The Zachman architectural framework was used to develop the project-management performance system’s ontology as the system dynamics model’s foundation. A case study was conducted for three cities with local government agencies to better understand the model components and factors that influence performance. Leadership involvement, project management processes, and project manager abilities were identified as critical factors that influence the project management performance level. To validate the results of the case study, the project management performance was further studied for the City of El Paso in terms of capability, capacity, and maturity level. The research study concluded that system dynamics is a feasible method and effective tool to measure management performance for engineering projects at local government agencies.

Keywords: project engineering management; performance measure; system dynamic model (search for similar items in EconPapers)
JEL-codes: A1 D0 D4 D6 D7 D8 D9 E0 E2 E3 E4 E5 E6 E7 F0 F2 F3 F4 F5 F6 G0 G1 G2 H0 J0 K2 L0 L1 L2 M0 M1 M2 M3 M4 M5 N0 N1 N2 O0 O1 P0 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2673-7116/2/4/24/pdf (application/pdf)
https://www.mdpi.com/2673-7116/2/4/24/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jbusin:v:2:y:2022:i:4:p:24-395:d:923475

Access Statistics for this article

Businesses is currently edited by Dr. Patrick Han

More articles in Businesses from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jbusin:v:2:y:2022:i:4:p:24-395:d:923475