Energy Management with Support of PV Partial Shading Modelling in Micro Grid Environments
Marco Severini,
Emanuele Principi,
Marco Fagiani,
Stefano Squartini and
Francesco Piazza
Additional contact information
Marco Severini: Department of Information Engineering, Università Politecnica delle Marche, Via Brecce Bianche 1, 60131 Ancona, Italy
Emanuele Principi: Department of Information Engineering, Università Politecnica delle Marche, Via Brecce Bianche 1, 60131 Ancona, Italy
Marco Fagiani: Department of Information Engineering, Università Politecnica delle Marche, Via Brecce Bianche 1, 60131 Ancona, Italy
Stefano Squartini: Department of Information Engineering, Università Politecnica delle Marche, Via Brecce Bianche 1, 60131 Ancona, Italy
Francesco Piazza: Department of Information Engineering, Università Politecnica delle Marche, Via Brecce Bianche 1, 60131 Ancona, Italy
Energies, 2017, vol. 10, issue 4, 1-18
Abstract:
Although photovoltaic power plants are suitable local energy sources in Micro Grid environments, when large plants are involved, partial shading and inaccurate modelling of the plant can affect both the design of the Micro Grid as well as the energy management process that allows for lowering the overall Micro Grid demand towards the main grid. To investigate the issue, a Photovoltaic Plant simulation model, based on a real life power plant, and an energy management system, based on a real life Micro Grid environment, have been integrated to evaluate the performance of a Micro Grid under partial shading conditions. Using a baseline energy production model as a reference, the energy demand of the Micro Grid has been computed in sunny and partial shading conditions. The experiments reveal that an estimation based on a simplified PV model can exceed by 65% the actual production. With regards to Micro Grid design, on sunny days, the expected costs, based on a simplified PV model, can be 5.5% lower than the cost based on the double inverter model. In single cloud scenarios, the underrating can reach 28.3%. With regard to the management process, if the energy yield is estimated by means of a simplified PV model, the actual cost can be from 17.1% to 21.5% higher than the theoretical cost expected at design time.
Keywords: micro grid; mixed integer linear programming; energy management; renewable energy sources; partial shading; photovoltaic systems (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/1996-1073/10/4/453/pdf (application/pdf)
https://www.mdpi.com/1996-1073/10/4/453/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:10:y:2017:i:4:p:453-:d:94713
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().