EconPapers    
Economics at your fingertips  
 

Energy Flexibility from Large Prosumers to Support Distribution System Operation—A Technical and Legal Case Study on the Amsterdam ArenA Stadium

Dirk Kuiken, Heyd F. Más, Maryam Haji Ghasemi, Niels Blaauwbroek, Thai H. Vo, Thijs Van der Klauw and Phuong H. Nguyen
Additional contact information
Dirk Kuiken: Faculty of Law, Groningen Centre of Energy Law (GCEL), University of Groningen, Oude Kijk in’t Jatstraat 26, 9712 EK Groningen, The Netherlands
Heyd F. Más: Faculty of Law, Groningen Centre of Energy Law (GCEL), University of Groningen, Oude Kijk in’t Jatstraat 26, 9712 EK Groningen, The Netherlands
Maryam Haji Ghasemi: Department of Electrical Engineering, Mathematics and Computer Science, University of Twente, Drienerlolaan 5, 7522 NB Enschede, The Netherlands
Niels Blaauwbroek: Electrical Energy Systems Group, Eindhoven University of Technology, 5600 MB Eindhoven, The Netherlands
Thai H. Vo: Electrical Energy Systems Group, Eindhoven University of Technology, 5600 MB Eindhoven, The Netherlands
Thijs Van der Klauw: Department of Electrical Engineering, Mathematics and Computer Science, University of Twente, Drienerlolaan 5, 7522 NB Enschede, The Netherlands
Phuong H. Nguyen: Electrical Energy Systems Group, Eindhoven University of Technology, 5600 MB Eindhoven, The Netherlands

Energies, 2018, vol. 11, issue 1, 1-29

Abstract: To deal with the rising integration of stochastic renewables and energy intensive distributed energy resources (DER) to the electricity network, alternatives to expensive network reinforcements are increasingly needed. An alternative solution often under consideration is integrating flexibility from the consumer side to system management. However, such a solution needs to be contemplated from different angles before it can be implemented in practice. To this end, this article considers a case study of the Amsterdam ArenA stadium and its surrounding network where flexibility is expected to be available to support the network in the future. The article studies the technical aspects of using this flexibility to determine to what extent, despite the different, orthogonal goals, the available flexibility can be used by various stakeholders in scenarios with a large load from electric vehicle charging points. Furthermore, a legal study is performed to determine the feasibility of the technical solutions proposed by analysing current European Union (EU) and Dutch law and focusing on the current agreements existing between the parties involved. The article shows that flexibility in the network provided by Amsterdam ArenA is able to significantly increase the number of charging points the network can accommodate. Nonetheless, while several uses of flexibility are feasible under current law, the use of flexibility provided by electric vehicles specifically faces several legal challenges in current arrangements.

Keywords: congestion management; demand side management (DSM); distribution system operation; electric vehicles; energy flexibility; legal framework; storage system (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://www.mdpi.com/1996-1073/11/1/122/pdf (application/pdf)
https://www.mdpi.com/1996-1073/11/1/122/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:11:y:2018:i:1:p:122-:d:125409

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:11:y:2018:i:1:p:122-:d:125409