Perceived and Reported Reliability of the Electricity Supply at Three Urban Locations in Indonesia

Kunaifi and Angèle Reinders
Additional contact information
Kunaifi: Department of Design, Production and Management, Faculty of Engineering Technology, University of Twente, P.O. Box 217, 7500 AE Enschede, The Netherlands
Angèle Reinders: Department of Design, Production and Management, Faculty of Engineering Technology, University of Twente, P.O. Box 217, 7500 AE Enschede, The Netherlands

Energies, 2018, vol. 11, issue 1, 1-27

Abstract: This paper focuses on the reliability of electricity supply at three different locations in Indonesia, namely in Sumatra, Timor, and Papua, through a comparison of reported indices of power reliability (SAIFI and SAIDI) and experimental results from user surveys and power measurements. The reason for this study is the lack of information about the actual, quantified reliability of power supplied by the main grid in Indonesia, while narratives of end-users indicate the reliability might be unsatisfactory. The study was executed using data from 114 randomly-selected respondents in the city of Pekanbaru in Sumatra, 65 in the city of Kupang in Timor and 26 in the city of Jayapura in Papua, totaling 205 respondents. These users experienced a higher unavailability of power delivered by the grid than expressed by the utility-reported SAIDI and SAIFI. Therefore, for this study, new indices are introduced, namely the Perceived (P) SAIDI and SAIFI, which are based on the frequency and duration of blackouts experienced by the users. It is concluded that the reported reliability indices do not always demonstrate the experience of the grid users. P-SAIFIs were 1.3 to 4.6 times higher in Pekanbaru and Kupang, respectively than the utility-reported SAIFIs for the same provinces. Also, P-SAIDIs were 2.6 to 3.9 times higher in Pekanbaru and Kupang, respectively, than the utilities’ SAIDIs. It is therefore not surprising that depending on the location, 14% to 65% of the users own a backup generator and that households are willing to pay $3 to $8 extra per monthly electricity bill or $1c–$3c per kWh for improved reliability.

Keywords: electricity; grid; Indonesia; reliability; user experiences (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (7)

Downloads: (external link)
https://www.mdpi.com/1996-1073/11/1/140/pdf (application/pdf)
https://www.mdpi.com/1996-1073/11/1/140/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:11:y:2018:i:1:p:140-:d:125734

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:11:y:2018:i:1:p:140-:d:125734