EconPapers    
Economics at your fingertips  
 

Reliability and Maintenance Prioritization Analysis of Combined Cooling, Heating and Power Systems

Jinming Jiang, Xindong Wei, Weijun Gao, Soichiro Kuroki and Zhonghui Liu
Additional contact information
Jinming Jiang: Faculty of Environmental Engineering, the University of Kitakyushu, Kitakyushu 808-0135, Japan
Xindong Wei: School of Environmental and Municipal Engineering, Jilin Jianzhu University, Changchun 130118, China
Weijun Gao: Faculty of Environmental Engineering, the University of Kitakyushu, Kitakyushu 808-0135, Japan
Soichiro Kuroki: Faculty of Environmental Engineering, the University of Kitakyushu, Kitakyushu 808-0135, Japan
Zhonghui Liu: Faculty of Environmental Engineering, the University of Kitakyushu, Kitakyushu 808-0135, Japan

Energies, 2018, vol. 11, issue 6, 1-24

Abstract: A combined cooling, heating, and power (CCHP) system is a complex and repairable system containing a large number of components and series of subsystems. When a failure occurs in one component, it might cause a failure of a subsystem or whole system. Traditional maintenance methods might lead to the waste of maintenance resources and a high cost of maintenance. The reliability and maintenance prioritization analyses can help managers optimize maintenance strategies and reduce the total cost. A reliability importance index is one of the factors in maintenance prioritization analysis. This paper aims at selecting the component reliability importance indices to identify the priority of component maintenance of a CCHP system from the perspective of maintenance cost. Failure cost importance index (FCI) and Potential failure cost importance index (PI) are developed for the maintenance prioritization analysis of a CCHP system. A Markov model based on the state–space method (SSM) is used to analyze the reliability and availability of a CCHP system. A set of actual survey reliability data of CCHP systems is used to support the validity of the reliability importance indices. The results indicate that the FCI and PI might lead to different rankings of maintenance prioritization. The FCI and PI will help managers make a reasonable decision for maintenance on a cost basis.

Keywords: reliability analysis; maintenance prioritization; state-space method; Markov process; CCHP system (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://www.mdpi.com/1996-1073/11/6/1519/pdf (application/pdf)
https://www.mdpi.com/1996-1073/11/6/1519/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:11:y:2018:i:6:p:1519-:d:151881

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:11:y:2018:i:6:p:1519-:d:151881