Thermo-Economic Analysis of A Geothermal Binary Power Plant in Indonesia—A Pre-Feasibility Case Study of the Wayang Windu Site
Andreas Diga Pratama Putera,
Annisa Nurul Hidayah and
Alison Subiantoro
Additional contact information
Andreas Diga Pratama Putera: Department of Engineering Science, The University of Auckland, 20 Symonds Street, Auckland 1010, New Zealand
Annisa Nurul Hidayah: Department of Engineering Science, The University of Auckland, 20 Symonds Street, Auckland 1010, New Zealand
Alison Subiantoro: Department of Mechanical Engineering, The University of Auckland, 20 Symonds Street, Auckland 1010, New Zealand
Energies, 2019, vol. 12, issue 22, 1-19
Abstract:
Indonesia has a predicted geothermal potential of 29 GWe, which is the biggest in the world. With this potential, the government has the ambitious target to generate as much as 7 GWe of electricity in 2025 from geothermal energy. However, the installed capacity of geothermal power plant in Indonesia until 2019 is only 1.9 GWe. Enhancements in already-installed geothermal power plants with a binary power plant can be considered to achieve the 2025 target. In this research, a thermo-economic analysis is carried out to assess the feasibility of binary power systems to enhance the existing geothermal power plants in Indonesia. The Wayang Windu site is selected as the case study. Three working fluids, i.e., n-Pentane, isopentane, and R245fa, are compared. Two different optimization objectives are considered and compared. First, the thermal efficiency is optimized to maximize the thermodynamic performance. In the second scenario, the heat exchanger area is optimized to maximize the economic performance. Analysis of the economic profitability variables, namely the payback period and internal rate of return, shows that optimizing the heat exchangers gives better economic results when compared to optimizing the thermal efficiency. The results also show that the type of working fluid significantly affects both the thermal efficiency and economic profitability of the binary power plant. Moreover, n-Pentane has the most preferred thermo-economic performance for the geothermal conditions at Wayang Windu with the smallest payback period of 13 years and the highest internal rate of return of 11.28%.
Keywords: thermodynamics; binary geothermal power plant; organic rankine cycle; pre-feasibility study; Wayang Windu geothermal power plant (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.mdpi.com/1996-1073/12/22/4269/pdf (application/pdf)
https://www.mdpi.com/1996-1073/12/22/4269/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:12:y:2019:i:22:p:4269-:d:285092
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().