A Study on Utility of Retrofit that Minimizes the Replacement of Heat-Source System in Large Offices
Hyemi Kim,
Kyung-soon Park,
Soolyeon Cho and
Young-hak Song
Additional contact information
Hyemi Kim: Ph. D. Course, Graduate School of Human-Environment Studies, Kyushu University, Fukuoka 819-0395, Japan
Kyung-soon Park: Architectural Engineering Major, Division of Urban, Architecture and Civil Engineering, Dong-eui University, Busan 47340, Korea
Soolyeon Cho: School of Architecture, College of Design North Carolina State University, Raleigh, NC 27695, USA
Young-hak Song: Department of Architectural Engineering, ERI, Gyeongsang National University, Jinju 52828, Korea
Energies, 2019, vol. 12, issue 22, 1-18
Abstract:
In a general building retrofit process, the reinforcement of insulation performance or air-tightness in walls and windows are conducted to reduce the maximum cooling and heating load of buildings. A heat source consists of heat-source equipment and water-pipe systems, which are replaced with high-efficient specification materials. Most of them are simply replaced with the same capacity as the previous heating equipment. This study aims to investigate matters required for decision making in a retrofit plan, such as conducting an investigation of the maximum load reduction in buildings obtained by the retrofit and the capacity of heat-source equipment that reflects the reduction, and the re-use or replacement of the water-pipe system, etc. in advance. This study verified that when the capacity of heat-source equipment was reduced, the pipe diameter of the water-pipe system was also decreased, but if existing pipes were re-used, the transportation power of the pump was reduced due to the reduction in flow velocity. The changes in maximum cooling and heating load through retrofit were quantitatively verified compared to that of the initial design of the building based on previous study results, and flow rates of cool and hot water were determined by re-calculating the capacity of the heat-source equipment. Using the results, the water-pipe system was re-designed, and the annual transportation power of the pump was calculated through simulations. The calculation results verified that the transportation power decreased by up to approximately 10% when oversized pipes were re-used from the existing water-pipe system. Additionally, when the capacity of the heat-source equipment was decreased, reasonable measures considering remodeling, construction duration, and cost were derived.
Keywords: retrofit; replacing; downsizing; heat source system; office building (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1996-1073/12/22/4309/pdf (application/pdf)
https://www.mdpi.com/1996-1073/12/22/4309/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:12:y:2019:i:22:p:4309-:d:286134
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().