Optimal Planning of Integrated Energy Systems for Offshore Oil Extraction and Processing Platforms
Anan Zhang,
Hong Zhang,
Meysam Qadrdan,
Wei Yang,
Xiaolong Jin and
Jianzhong Wu
Additional contact information
Anan Zhang: School of Electrical and Information Engineering, Southwest Petroleum University, Chengdu 610500, China
Hong Zhang: School of Electrical and Information Engineering, Southwest Petroleum University, Chengdu 610500, China
Meysam Qadrdan: School of Engineering, Cardiff University, Cardiff CF24 3AA, UK
Wei Yang: School of Electrical and Information Engineering, Southwest Petroleum University, Chengdu 610500, China
Xiaolong Jin: School of Engineering, Cardiff University, Cardiff CF24 3AA, UK
Jianzhong Wu: School of Engineering, Cardiff University, Cardiff CF24 3AA, UK
Energies, 2019, vol. 12, issue 4, 1-28
Abstract:
With the introduction of new technologies, such as waste heat recovery units (WHRU), associated gas utilization, the energy flow coupling relationship is further deepened within the energy system of the offshore oil and gas production platform. Besides, the energy system is closely linked with the oil and gas production system, and a closed-loop relationship between energy flow and material flow can be revealed. Uncertainties of energy supply and production process may lead to system-wide fluctuations, which threaten the stable operation of the platform. Therefore, an optimal planning model of integrated energy system for offshore oil and gas production platform is proposed in this paper. Firstly, a generalized energy and material flow model is proposed, three matrixes are defined based on laws of thermodynamics, including energy matrix, process matrix and feedback matrix. Secondly, the energy-material conversion relationship between the energy system and production system of a typical offshore oil and gas platform is quantitatively described, together with the coupling between the input and output of the two systems. Thirdly, considering the energy-material balance constraints and the uncertainties of production system, a multi-objective stochastic planning model for the offshore integrated energy system is established, which takes economics and environmental protection into consideration. A Monte Carlo simulation-based NSGA-II algorithm is proposed to solve the model. Finally, the validity and feasibility of the proposed methodology are demonstrated through an offshore oil and gas platform in Bohai, China. Compared with the traditional planning method, the total cost and CO 2 emissions of the proposed method are reduced by 18.9% and 17.3%, respectively.
Keywords: energy system; production system; uncertainty; generalized energy and material flow model; stochastic multi-objective optimization (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.mdpi.com/1996-1073/12/4/756/pdf (application/pdf)
https://www.mdpi.com/1996-1073/12/4/756/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:12:y:2019:i:4:p:756-:d:208720
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().