EconPapers    
Economics at your fingertips  
 

The DSR Scheme in the Capacity Market of Industrial Enterprises in Poland—Participation Determinants

Bartosz Jeżyna, Marcin Lis and Agata Mesjasz-Lech
Additional contact information
Bartosz Jeżyna: Department of Management, Faculty of Applied Sciences, WSB University, 41-300 Dąbrowa Górnicza, Poland
Marcin Lis: Department of Management, Faculty of Applied Sciences, WSB University, 41-300 Dąbrowa Górnicza, Poland
Agata Mesjasz-Lech: The Management Faculty, Czestochowa University of Technology, Dabrowskiego 69, 42-201 Czestochowa, Poland

Energies, 2020, vol. 13, issue 20, 1-16

Abstract: The purpose of this article is to present the key differences between the Polish Guaranteed DSR (demand-side response) Scheme operating from 2017 to 2020 and the Polish Capacity Market DSR Scheme operating from 2021, and their impacts on the decision to participate in the DSR scheme. The present study attempts to compare the rules of the old and new schemes and their impacts on the participation decision depending on the industry of the potential scheme participant. The study was conducted on a group of 50 randomly selected companies. A structured interview was used to collect information, and a chi-quadrant independence test and a Wilcoxon–Mann–Whitney test were used in the analysis of the collected data. The study was conducted in selected enterprises located in Poland. The results of the study indicate the elements that are similar to the literature on the subject, and key aspects arising from the unique characteristics of the Polish market and the industry of the potential participant. A detailed analysis of the collected data showed that the position of the respondent in the company and the size of the company do not affect the level of knowledge of the DSR market, or the decision concerning cooperation or the manner of reduction. All the respondents have higher opinions about the new Capacity Market DSR Scheme, which confirms the proper direction of the changes in relation to the ending Guaranteed DSR Scheme.

Keywords: DSR; capacity market; DSR guaranteed program; capacity market DSR program (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://www.mdpi.com/1996-1073/13/20/5462/pdf (application/pdf)
https://www.mdpi.com/1996-1073/13/20/5462/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:13:y:2020:i:20:p:5462-:d:431231

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:13:y:2020:i:20:p:5462-:d:431231