Planning of Aegean Archipelago Interconnections to the Continental Power System of Greece
Michalis E. Karystianos,
Charalampos N. Pitas,
Stamatina P. Efstathiou,
Marina A. Tsili,
John C. Mantzaris,
Eirini A. Leonidaki,
Emmanouil M. Voumvoulakis and
Nikos G. Sakellaridis
Additional contact information
Michalis E. Karystianos: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece
Charalampos N. Pitas: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece
Stamatina P. Efstathiou: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece
Marina A. Tsili: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece
John C. Mantzaris: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece
Eirini A. Leonidaki: Hellenic Electricity Distribution Network Operator (HEDNO-DEDDIE), 24 Syngrou Av., 117 42 Athens, Greece
Emmanouil M. Voumvoulakis: Hellenic Electricity Distribution Network Operator (HEDNO-DEDDIE), 24 Syngrou Av., 117 42 Athens, Greece
Nikos G. Sakellaridis: Hellenic Electricity Distribution Network Operator (HEDNO-DEDDIE), 24 Syngrou Av., 117 42 Athens, Greece
Energies, 2021, vol. 14, issue 13, 1-19
Abstract:
This paper presents the results of a thorough planning investigation carried out by the Transmission System Operator (TSO) and the Distribution Network Operator (DNO) in Greece in order to study the interconnections of the Aegean Islands with the mainland power system. The feasibility of interconnecting islands is based on the need for a reliable power supply to isolated and autonomous islands, reducing the operating costs of the power generation system through the withdrawal of high-cost oil-fired generating units, and the further ability to increase renewable energy source (RES) penetration in the country’s energy mix, according to directions imposed by the National Energy and Climate Plan. Among the alternative topologies and interconnection technologies considered, the final selection of the interconnection scheme selected for inclusion in the development plans of TSO and DNO was based on their detailed comparative evaluation, considering financial and other technical criteria.
Keywords: transmission planning; island interconnections; security analysis; energy simulation; economic assessment (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2021
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/1996-1073/14/13/3818/pdf (application/pdf)
https://www.mdpi.com/1996-1073/14/13/3818/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:14:y:2021:i:13:p:3818-:d:581803
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().