EconPapers    
Economics at your fingertips  
 

Increasing the Efficiency of Sealing the Borehole in Terms of Spacer Pumping Time

Marcin Kremieniewski, Miłosz Kędzierski and Sławomir Błaż
Additional contact information
Marcin Kremieniewski: Oil and Gas Institute—National Research Institute, 25A Lubicz Str., 31-503 Krakow, Poland
Miłosz Kędzierski: Oil and Gas Institute—National Research Institute, 25A Lubicz Str., 31-503 Krakow, Poland
Sławomir Błaż: Oil and Gas Institute—National Research Institute, 25A Lubicz Str., 31-503 Krakow, Poland

Energies, 2021, vol. 14, issue 20, 1-11

Abstract: The tightness of a borehole is essential for its long-term durability. For this purpose, the column of the pipe is sealed with cement slurry. After contacting the slurry, mud in the borehole is removed. However, the slurry does not effectively remove the remaining drilling mud. Therefore, the annular space is cleaned with a wash. Effectively cleaning the borehole presents quite a problem, as many variables that affect the stability of the borehole need to be considered. The time of contact between the borehole and the wash is very important. On the one hand, insufficient contact time does not guarantee proper removal of the mud. On the other hand, a long contact time may destroy the wall of the borehole. To address these problems, studies were carried out to assess the effect of the wash contact time on annular space cleaning. When determining the time of washing, a compromise between effective cleaning and the stability of the borehole wall is required. In the research presented in this publication, the simplest wash was used, i.e., water. This choice was based on the objective of observing the influence of the wash time on cleaning, i.e., the preparation of the borehole for cementing. By using water, the physicochemical action of surfactants can be ignored. In order to capture changes in cleaning due to differences in contact time, a control test was performed using a pure sandstone core without mud. The effect of the wash contact time on the cleaning of the annular space was investigated by determining the adhesion of the cement sheath to the rock core. First, mud was formed on the core, and then it was removed. By comparing the obtained adhesion to the reference sample, the effectiveness of the deposit removal was determined. On the basis of this research, the optimal wash contact time was determined.

Keywords: drilling fluids; wash; mud cake; annular space; borehole cleaning; cementing; wash contact time (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://www.mdpi.com/1996-1073/14/20/6702/pdf (application/pdf)
https://www.mdpi.com/1996-1073/14/20/6702/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:14:y:2021:i:20:p:6702-:d:657246

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:14:y:2021:i:20:p:6702-:d:657246