Defect Localization Inside Simulated MV Switchgear Based on Cumulative Energy Curve Using Transient Earth Voltage Sensors
Ramadan Fayez Ewaida,
Nissar Rasool Wani,
Yasin Khan and
Abdulrahman Ali Al-Arainy
Additional contact information
Ramadan Fayez Ewaida: Department of Electrical Engineering, College of Engineering, King Saud University, Riyadh 11421, Saudi Arabia
Nissar Rasool Wani: Department of Electrical Engineering, College of Engineering, King Saud University, Riyadh 11421, Saudi Arabia
Yasin Khan: Department of Electrical Engineering, College of Engineering, King Saud University, Riyadh 11421, Saudi Arabia
Abdulrahman Ali Al-Arainy: Department of Electrical Engineering, College of Engineering, King Saud University, Riyadh 11421, Saudi Arabia
Energies, 2021, vol. 14, issue 2, 1-13
Abstract:
The partial discharge (PD) leads to catastrophic failure of the medium voltage (MV) switchgear insulation. Determination of the PD source (defect) location in high voltage (HV) equipment is very important in the maintenance procedures and in isolating the root cause of PD generation. In this paper, the transient earth voltage (TEV) detection method was used to acquire defect-initiated PD signals in a simulated MV switchgear model. An array of four TEV sensors were placed on the surface walls outside an MV switchgear tank to acquire the PD signals generated from the known location(s)/coordinates of sharp needle type defect inside the tank. The time difference of arrival (TDOA) between signals that are captured by the TEV sensors array was critically analyzed. Estimating the TDOA between PD signals generated by PD source at a known location with high accuracy is of great importance for accurate defect localization. The cumulative energy method (CEM) is used to estimate the onset time point of each TEV signal. The estimated TDOA by the cumulative energy method is compared with actual and expected TDOA based on known coordinates of PD source and TEV sensors. Experimental data are used as a basis for determining the TEV method accuracy for PD source localization. Experimental results show the average error of time difference is about 1.34 ns, which is equivalent to the propagation distance of 0.4 m.
Keywords: partial discharge; TEV sensor; radiometric; UHF; AE; localization; time difference of arrival (TDOA), cumulative energy method; medium voltage switchgear (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2021
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1996-1073/14/2/320/pdf (application/pdf)
https://www.mdpi.com/1996-1073/14/2/320/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:14:y:2021:i:2:p:320-:d:477059
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().