EconPapers    
Economics at your fingertips  
 

The Influence of Geometric Parameters of Pump Installation on the Hydraulic Performance of a Prefabricated Pumping Station

Bowen Zhang, Li Cheng, Chunlei Xu and Mo Wang
Additional contact information
Bowen Zhang: College of Hydraulic Science and Engineering, Yangzhou University, Yangzhou 225009, China
Li Cheng: College of Hydraulic Science and Engineering, Yangzhou University, Yangzhou 225009, China
Chunlei Xu: Key Water Conservancy Project Management Office, Wuxi 214000, China
Mo Wang: Anhui Branch of Hainan Water Resources and Hydropower Survey and Design Institute, Hefei 225000, China

Energies, 2021, vol. 14, issue 4, 1-15

Abstract: A prefabricated pumping station is a new type of pumping station that plays an important role in the construction of sponge cities in developing countries. It solves the problem of urban water-logging and makes great contributions to the sustainable development of water resources. In order to research the influence of different installation positions of pumps on the internal hydraulic performance of a prefabricated pumping station, based on ANSYS software, the computational fluid dynamics (CFD) numerical simulation method was used to analyze the internal flow state of the prefabricated pump station. In this research, the optimal geometric parameters of pump installation in a prefabricated pumping station are given. The results show that when the distance between the connecting line of two pumps and the center of the sump is L = 0.2 R , the distance between the two pumps is S = 0.6 R , and the suspension height of the two pumps is H = 0.6 D , the internal flow pattern of the prefabricated pump station is better. ( R is the cross-sectional radius of the sump and D is the diameter of the nozzle of the pump horn.) These research results have certain guiding significance for improvement of the hydraulic performance and operation efficiency of prefabricated pump stations. They also provide a theoretical basis for parameter selection for prefabricated pumping stations.

Keywords: prefabricated pumping station; hydraulic performance; geometric parameter; installation position; numerical simulation (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/14/4/1039/pdf (application/pdf)
https://www.mdpi.com/1996-1073/14/4/1039/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:14:y:2021:i:4:p:1039-:d:500326

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:14:y:2021:i:4:p:1039-:d:500326