Study on the Combined Mining Scheme for Coal Resources under High-Voltage Pylons and the Reinforcement for Pylons
Hongyang Liu,
Mingrui Du,
Boyang Zhang,
Zhibin Lin,
Chengwei Liu and
Feng Wang
Additional contact information
Hongyang Liu: School of Mining and Mechanical Engineering, Liupanshui Normal University, Liupanshui 553004, China
Mingrui Du: School of Water Conservancy Engineering, Zhengzhou University, Zhengzhou 450001, China
Boyang Zhang: School of Civil Engineering, Henan Polytechnic University, Jiaozuo 454000, China
Zhibin Lin: School of Civil Engineering, Henan Polytechnic University, Jiaozuo 454000, China
Chengwei Liu: School of Mining and Mechanical Engineering, Liupanshui Normal University, Liupanshui 553004, China
Feng Wang: School of Mining and Mechanical Engineering, Liupanshui Normal University, Liupanshui 553004, China
Energies, 2022, vol. 15, issue 11, 1-18
Abstract:
The increasing use of high-voltage transmission wires requires more and more high-voltage pylons, and sometimes, constructing pylons in mining areas is very urgent. To ensure the safe operation of pylons, coal pillars with large side lengths are usually used to provide sufficient support; however, this results in a huge waste of coal. Eight high-voltage pylons are arranged on the ground surface corresponding to the location of working face 1110 of Sima Coal Mine in Shanxi Province, China, which cannot be mined by traditional methods. Taking this as the engineering background, the failure mode of high-voltage pylon is first analyzed. Using FLAC 3D numerical simulations, the influence of five different mining plans on ground surface deformation in working face 1110 is evaluated, and the vertical settlement and horizontal deformation in different areas of the ground surface, as well as the variation law of horizontal strain and slope are analyzed. According to the numerical simulation results, the range of thickness-limiting mining or backfill mining in working face 1110 is shown in scheme 3, and the key regions in the mining process are determined. Secondly, the strengthening scheme of high-voltage pylons is designed, that is, the four foundations of high-voltage pylons are connected as a whole with steel supports and steel connectors so as to improve the structural strength of the high-voltage pylon. Finally, the position change in the foundation of high-voltage pylons was monitored for 22 consecutive months. The results show that the maximum settlement of the high-voltage tower foundation is 3.1 m, which is consistent with the actual mining thickness; The high-voltage pylon was stably moved, and the change in transmission line tension and total length was usually less than 1.0%. The combined mining scheme and foundation strengthening scheme can ensure the safe operation of high-voltage pylons and provide a new method for the stability control of ground buildings in coal mining subsidence area.
Keywords: high-voltage pylons; combined mining scheme; foundation strengthening; numerical simulation and field monitoring (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1996-1073/15/11/3978/pdf (application/pdf)
https://www.mdpi.com/1996-1073/15/11/3978/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:15:y:2022:i:11:p:3978-:d:826327
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().