GIS-MCDM-Based Approach to Site Selection of Wave Power Plants for Islands in China
Meng Shao,
Shulei Zhang,
Jinwei Sun,
Zhixin Han,
Zhuxiao Shao and
Chuanxiu Yi
Additional contact information
Meng Shao: College of Engineering, Ocean University of China, Qingdao 266100, China
Shulei Zhang: College of Engineering, Ocean University of China, Qingdao 266100, China
Jinwei Sun: College of Engineering, Ocean University of China, Qingdao 266100, China
Zhixin Han: Economics and Management School, Wuhan University, Wuhan 430072, China
Zhuxiao Shao: College of Engineering, Ocean University of China, Qingdao 266100, China
Chuanxiu Yi: College of Engineering, Ocean University of China, Qingdao 266100, China
Energies, 2022, vol. 15, issue 11, 1-24
Abstract:
On-site development of wave energy resources is a promising way to overcome power-shortage problems on islands. It is necessary to select suitable islands to deploy wave power plants, which are influenced by multiple factors related to resources, technology, economy, society, and environment. This study develops a two-stage decision framework to identify feasible islands and determine priority order based on geographic information systems (GIS) and multicriteria decision-making (MCDM). In the exclusion stage, unfeasible marine areas are excluded based on exclusion criteria and feasible island alternatives are identified. In the evaluation stage, alternatives are evaluated by evaluation criteria using the combined weighting method and the technique for order of preference by similarity to ideal solution (TOPSIS)-grey relation analysis (GRA) method. As the combined weighting method is based on the fuzzy group decision-making (GDM)-analytic hierarchy process (AHP) and the entropy method, it can effectively reduce subjective deviation. The proposed framework is applied in Shandong Province. It identifies 13 inhabited islands feasible for constructing wave power plants, among which Daguan, South Changshan, and Xiaoguan are the optimal ones. Sensitivity analysis is performed to verify the feasibility of the proposed framework. The results show that it is effective and could provide reference for practical engineering.
Keywords: site selection; GIS; MCDM; wave power plants; island alternatives (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/1996-1073/15/11/4118/pdf (application/pdf)
https://www.mdpi.com/1996-1073/15/11/4118/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:15:y:2022:i:11:p:4118-:d:831174
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().