Localization Method and Finite Element Modelling of the Mid-Point Anchor of High-Speed Railway Distributed in Long Straight Line with Large Slope
Xiuhua Wang,
Kun Yang,
Yongzhi Min () and
Yongliang Wang
Additional contact information
Xiuhua Wang: School of Automation and Electrical Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China
Kun Yang: Guangdong Provincial Railway Construction Investment Group Co., Ltd., Guangzhou 510665, China
Yongzhi Min: School of Automation and Electrical Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China
Yongliang Wang: School of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China
Energies, 2022, vol. 15, issue 16, 1-16
Abstract:
In order to ensure the safe and reliable operation of a high-speed railway, the precise positioning of the mid-point anchor in the catenary is very important. In view of the two problems in the calculation of the mid-point anchor position of the catenary in a long ramp section, the calculation accuracy is low, and the calculation of the central anchor clamp position is lacking. In this study, the predetermined location of the mid-point anchor is chosen based on the mid-point anchor location principle and the line condition, and the range of the allowable error of the mid-point anchor setting is determined according to the predetermined position of the mid-point anchor. Secondly, by considering the impact of the line ramp and using the measured span length, the tension difference of the clue in the direction of the line is calculated. Then, the theoretical location of the mid-point anchor clamp is determined using the downhill component and the tension difference. Finally, the theoretical position of the clamp is corrected according to the setting of the dropper to obtain the corrected position of the clamp. An FEM (finite element method) of the catenary is established in ANSYS software to calculate the height difference between the messenger cable and the contact wire at the point of the mid-point anchor setting, and then the length of the mid-point anchor rope is obtained. Through the calculation of actual case data, the maximum value of the relative error of the location of the mid-point anchor obtained by this proposed method is very small compared with the actual position, which verifies the effectiveness of this method.
Keywords: railway catenary; mid-point anchor; location method; tension difference; FEM; long and steep grade (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1996-1073/15/16/5957/pdf (application/pdf)
https://www.mdpi.com/1996-1073/15/16/5957/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:15:y:2022:i:16:p:5957-:d:890411
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().