Hardware Development and Interoperability Testing of a Multivendor-IEC-61850-Based Digital Substation
Tanushree Bhattacharjee,
Majid Jamil,
Majed A. Alotaibi,
Hasmat Malik and
Mohammed E. Nassar
Additional contact information
Tanushree Bhattacharjee: Department of Electrical Engineering, Jamia Milia Islamia, New Delhi 110025, India
Majid Jamil: Department of Electrical Engineering, Jamia Milia Islamia, New Delhi 110025, India
Majed A. Alotaibi: Department of Electrical Engineering, College of Engineering, King Saud University, Riyadh 11421, Saudi Arabia
Hasmat Malik: BEARS, NUS Campus, University Town, Singapore 138602, Singapore
Mohammed E. Nassar: Department of Electrical and Computer Engineering, University of Waterloo, Waterloo, ON N2L 3G1, Canada
Energies, 2022, vol. 15, issue 5, 1-19
Abstract:
Substations are becoming increasingly reliant on international electrotechnical commission (IEC)-61850-enabled devices. However, device compatibility with these standards does not guarantee interoperability when devices are taken from different manufacturers. If interoperability of multivendor devices can be achieved, then power utilities will be in a position to implement multivendor devices in substations. The study here presents the development and testing of a digital substation test platform that incorporates devices from different manufacturers. The process bus communication and protection operation of the intelligent electronic devices (IEDs) were tested to validate device interoperability. The testbed was tested for two IED process bus communications, generic object-oriented substation event (GOOSE) and sampled measured value (SMV). The GOOSE is travelling between IED to IED with an end-to-end (ETE) delay of 2 ms and the SMV read by the IEDs are the same as the injected real-time substation inputs 220 kV and 1 kA. Three IED protection studies (overcurrent, earth fault, and overvoltage) were performed, and IED response curves were obtained. In addition, data monitoring and client–server communications were studied using installed software tools. The testbed configuration in this study has faced some real-time challenges regarding differences in device edition, device firmware, and ethernet switch due to its multivendor approach. All the mentioned configuration issues were resolved in this study with successful testing and validation of the testbed. The study of this testbed will provide solutions to the problems associated with a multivendor system faced by substation engineers and will help them in opting for multivendor installations. This system can be extended in the future by installing more multivendor devices with complex network topology and a SCADA system.
Keywords: ethernet network; GOOSE; IEC 61850 standard; multivendor testbed; process bus communication; substation protection; SMV; substation automation (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
https://www.mdpi.com/1996-1073/15/5/1785/pdf (application/pdf)
https://www.mdpi.com/1996-1073/15/5/1785/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:15:y:2022:i:5:p:1785-:d:760759