A Review of Energy-Efficient and Sustainable Construction Scheduling Supported with Optimization Tools

Borna Dasović and Uroš Klanšek
Additional contact information
Borna Dasović: Faculty of Civil Engineering, Transportation Engineering and Architecture, University of Maribor, Smetanova ulica 17, 2000 Maribor, Slovenia
Uroš Klanšek: Faculty of Civil Engineering, Transportation Engineering and Architecture, University of Maribor, Smetanova ulica 17, 2000 Maribor, Slovenia

Energies, 2022, vol. 15, issue 7, 1-17

Abstract: This article reviews the accomplishments of studies in which optimization tools were used to develop energy-efficient and sustainable construction schedules. With the increase in global awareness of environmental issues, the construction industry has been forced to explore innovative techniques to make the building process more energy-efficient and sustainable. Project managers can use optimization tools in their scheduling procedures to address these issues in the early stages of the project. Therefore, this paper examines different optimization-based construction scheduling methods and their impact on schedule energy efficiency and the three key sustainability goals: economic viability, social equity, and environmental protection. Such a review has not yet been conducted to the best of our knowledge. This research aims to fill the gap and contribute to understanding advanced optimization tools that can pave the way to energy-efficient and sustainable scheduling practices. After a brief introduction, the background of optimization-based construction scheduling techniques that aim to improve construction management and incorporate these aspects into the decision-making process is explained. Then, these approaches are addressed in detail. It is determined for each study whether it adopted energy efficiency goals and which sustainability dimensions it considered within the proposed optimization model. The results of this study indicate a wide heuristic algorithms application for complex scheduling problems. Meanwhile, mathematical programming is still quite unexplored, especially methods that utilize algebraic modeling languages. This study provides a foundation for further research by addressing the current reach in development and possible knowledge gaps that could be researched in future studies. The paper also discusses the advantages and limitations of different approaches and illustrates the potential for utilizing these methods. Supported by the main review findings, conclusions and recommendations for further research are provided.

Keywords: construction; project management; optimization tools; scheduling; sustainability; energy efficiency (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://www.mdpi.com/1996-1073/15/7/2330/pdf (application/pdf)
https://www.mdpi.com/1996-1073/15/7/2330/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:15:y:2022:i:7:p:2330-:d:777581

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:15:y:2022:i:7:p:2330-:d:777581