Location and Technical Requirements for Photovoltaic Power Stations in Poland
Krystyna Kurowska,
Hubert Kryszk and
Stanisław Bielski
Additional contact information
Krystyna Kurowska: Department of Spatial Analysis and the Real Estate Market, Faculty of Geoengineering, University of Warmia and Mazury in Olsztyn, Prawocheńskiego 15, 10-720 Olsztyn, Poland
Hubert Kryszk: Department of Spatial Analysis and the Real Estate Market, Faculty of Geoengineering, University of Warmia and Mazury in Olsztyn, Prawocheńskiego 15, 10-720 Olsztyn, Poland
Stanisław Bielski: Faculty of Agriculture and Forestry, University of Warmia and Mazury in Olsztyn, Oczapowskiego 8, 10-718 Olsztyn, Poland
Energies, 2022, vol. 15, issue 7, 1-16
Abstract:
The objective of Poland’s energy policy is to guarantee energy security while enhancing economic competitiveness and energy efficiency, thus minimizing the power sector’s environmental impact and optimizing the use of energy resources in the country. Poland is not the only European country to rely on coal for power generation. Historical factors and large coal deposits act as natural barriers to increasing the share of renewable energy in the Polish power sector. Yet, today, environmental concerns and climate change are prompting many countries to move away from fossil fuels. Renewable energy sources, such as solar and wind energy, are an alternative to traditional energy generated from fossil fuels. However, investors developing solar and wind farms in Poland encounter numerous problems at each stage of the project. These difficulties are associated mainly with the location, technical requirements, infrastructure and formal and legal documents. This study aimed to identify the key factors that influence the development of photovoltaic power stations in Poland, with special emphasis on the choice of location and technical aspects of the investment process. The demand for clean energy and the renewable energy prospects for Poland are discussed based on the example of solar farms. Sixty-seven prospective farm locations were analyzed, and the results of the analysis were used to identify the main barriers and opportunities for renewable energy development in Poland. The option of connecting solar farms to the existing power grid was also examined. This study demonstrates that the development of solar farms in Poland is inhibited mainly by technical barriers, in particular the lack of options for connecting farms to the power grid, as well as the absence of support mechanisms and dedicated legislative solutions, rather than environmental obstacles.
Keywords: renewable energy sources; photovoltaic power stations; planning requirements; connection to the power grid (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (10)
Downloads: (external link)
https://www.mdpi.com/1996-1073/15/7/2701/pdf (application/pdf)
https://www.mdpi.com/1996-1073/15/7/2701/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:15:y:2022:i:7:p:2701-:d:788201
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().