A Fuzzy Prescriptive Analytics Approach to Power Generation Capacity Planning
Berna Tektaş,
Hasan Hüseyin Turan,
Nihat Kasap,
Ferhan Çebi and
Dursun Delen
Additional contact information
Berna Tektaş: Faculty of Business Administration, Izmir Katip Celebi University, Cigli, Izmir 35620, Turkey
Hasan Hüseyin Turan: School of Engineering and Information Technology, University of New South Wales, Canberra, ACT 2612, Australia
Nihat Kasap: Sabanci Business School, Sabanci University, Tuzla, Istanbul 34956, Turkey
Ferhan Çebi: Management Faculty, Istanbul Technical University, Maçka, Istanbul 34367, Turkey
Dursun Delen: Spears School of Business, Oklahoma State University, Stillwater, OK 74078, USA
Energies, 2022, vol. 15, issue 9, 1-26
Abstract:
This study examines the long-term energy capacity investment problem of a power generation company (GenCo), considering the drought threat posed by climate change in hydropower resources in Turkey. The mid-term planning decisions such as maintenance and refurbishment scheduling of power plants are also considered in the studied investment planning problem. In the modeled electricity market, it is assumed that GenCos conduct business in uncertain market conditions with both bilateral contracts (BIC) and day-ahead market (DAM) transactions. The problem is modeled as a fuzzy mixed-integer linear programming model with a fuzzy objective and fuzzy constraints to handle the imprecisions regarding both the electricity market (e.g., prices) and environmental factors (e.g., hydroelectric output due to drought). Bellman and Zadeh’s max-min criteria are used to transform the fuzzy capacity investment model into a model with a crisp objective and constraints. The applicability of methodology is illustrated by a case study on the Turkish electric market in which GenCo tries to find the optimal power generation investment portfolio that contains five various generation technologies alternatives, namely, hydropower, wind, conventional and advanced combined-cycle natural gas, and steam (lignite) turbines. The results show that wind turbines with low marginal costs and steam turbines with high energy conversion efficiency are preferable, compared with hydroelectric power plant investments when the fuzziness in hydroelectric output exists (i.e., the expectation of increasing drought conditions as a result of climate change). Furthermore, the results indicate that the gas turbine investments were found to be the least preferable due to high gas prices in all scenarios.
Keywords: generation investment planning; maintenance and refurbishment scheduling; uncertainty; fuzzy mathematical programming; climate change (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1996-1073/15/9/3176/pdf (application/pdf)
https://www.mdpi.com/1996-1073/15/9/3176/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:15:y:2022:i:9:p:3176-:d:803008
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().