A 3D Transient CFD Simulation of a Multi-Tubular Reactor for Power to Gas Applications
Victor Soto,
Claudia Ulloa and
Ximena Garcia
Additional contact information
Victor Soto: Carbon and Catalysis Laboratory (CarboCat), Department of Chemical Engineering, Faculty of Engineering, Universidad de Concepción, P.O. Box 160-C, Concepcion 4070386, Chile
Claudia Ulloa: Environmental Engineering Department, Faculty of Environmental Sciences and EULA Chile Centre, Universidad de Concepción, P.O. Box 160-C, Concepcion 4070386, Chile
Ximena Garcia: Carbon and Catalysis Laboratory (CarboCat), Department of Chemical Engineering, Faculty of Engineering, Universidad de Concepción, P.O. Box 160-C, Concepcion 4070386, Chile
Energies, 2022, vol. 15, issue 9, 1-21
Abstract:
A 3D stationary CFD study was conducted in our previous work, resulting in a novel reactor design methodology oriented to upgrading biogas through CO 2 methanation. To enhance our design methodology incorporating relevant power to gas operational conditions, a novel transient 3D CFD modelling methodology is employed to simulate the effect of relevant dynamic disruptions on the behaviour of a tubular fixed bed reactor for biogas upgrading. Unlike 1D/2D models, this contribution implements a full 3D shell cooled methanation reactor considering real-world operational conditions. The reactor’s behaviour was analysed considering the hot-spot temperature and the outlet CH 4 mole fraction as the main performance parameters. The reactor start-up and shutdown times were estimated at 330 s and 130 s, respectively. As expected, inlet feed and temperature disruptions prompted “wrong-way” behaviours. A 30 s H 2 feed interruption gave rise to a transient low-temperature hot spot, which dissipated after 60 s H 2 feed was resumed. A 20 K rise in the inlet temperature (523–543 K) triggered a transient low-temperature hot spot (879 to 850 K). On the contrary, a 20 K inlet temperature drop resulted in a transient high-temperature hot spot (879 to 923 K), which exposed the catalyst to its maximum operational temperature. The maximum idle time, which allowed for a warm start of the reactor, was estimated at three hours in the absence of heat sources. No significant impacts were found on the product gas quality (% CH 4 ) under the considered disruptions. Unlike typical 1D/2D simulation works, a 3D model allowed to identify the relevant design issues like the impact of hot-spot displacement on the reactor cooling efficiency.
Keywords: CO 2 methanation; biogas upgrading; CFD; multi-tubular reactor; power to gas (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1996-1073/15/9/3383/pdf (application/pdf)
https://www.mdpi.com/1996-1073/15/9/3383/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:15:y:2022:i:9:p:3383-:d:809475
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().