Construction Management Supported by BIM and a Business Intelligence Tool

Fernanda Rodrigues, Ana Dinis Alves and Raquel Matos
Additional contact information
Fernanda Rodrigues: RISCO—Research Center for Risks and Sustainability in Construction, Civil Engineering Department, University of Aveiro, Campus Universitário de Santiago, 3810-193 Aveiro, Portugal
Ana Dinis Alves: RISCO—Research Center for Risks and Sustainability in Construction, Civil Engineering Department, University of Aveiro, Campus Universitário de Santiago, 3810-193 Aveiro, Portugal
Raquel Matos: RISCO—Research Center for Risks and Sustainability in Construction, Civil Engineering Department, University of Aveiro, Campus Universitário de Santiago, 3810-193 Aveiro, Portugal

Energies, 2022, vol. 15, issue 9, 1-14

Abstract: The construction sector generates large amounts of heterogeneous and dynamic data characterized by their fragmentation throughout the life cycle of a project. Immediate and accurate access to that data is fundamental to the management, decision-making and analysis by construction owners, supervisors, managers, and technicians involved in the different phases of the project life cycle. However, since construction project data are diverse, dispersed, uncorrelated, and difficult to visualize, a reliable basis for decision-making can rarely be established by the management team. Aiming to bridge this gap, a methodology for data management during building construction by means of Data with BIM and Business Intelligence (BI) analysis tools was developed in this study. This methodology works by extracting data from 3D parametric model and integrating it with a BI tool, through which data are visualized and interrelated with the same database, the BIM model. To demonstrate the applicability of the methodology, a study case was carried out. It was shown that this methodology provides a collaborative platform for accurate data analysis to the construction management and supervision teams, allowing project stakeholders to access and update data in real-time, in permanent linkage with the BIM model. Additionally, improving the reliability of the decision-making process and ensuring project deliverability, the developed methodology contributes to a more sustainable management process by decreasing errors and resource consumption, including energy. Therefore, the main goal of this study is to present a methodology for data analysis with BIM models integrated with BI for sustainable construction management.

Keywords: sustainable management; parametric modelling; data analysis; Power BI (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/15/9/3412/pdf (application/pdf)
https://www.mdpi.com/1996-1073/15/9/3412/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:15:y:2022:i:9:p:3412-:d:810227

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:15:y:2022:i:9:p:3412-:d:810227