Identifying and Ranking the Root Causes of Schedule Delays in Oil and Gas Pipeline Construction Projects

Adel Alshibani (), Mohammed Julaih, Ahamd Adress, Othman Alshamrani and Faris Almaziad
Additional contact information
Adel Alshibani: Construction Engineering & Management Department, King Fahd University of Petroleum and Minerals, Dhahran 34463, Saudi Arabia
Mohammed Julaih: Construction Engineering & Management Department, King Fahd University of Petroleum and Minerals, Dhahran 34463, Saudi Arabia
Ahamd Adress: Construction Engineering & Management Department, King Fahd University of Petroleum and Minerals, Dhahran 34463, Saudi Arabia
Othman Alshamrani: Building Engineering Department, Imam Abdulrahman Bin Faisal University, 2835 King Faisal Road, Dammam 34212, Saudi Arabia
Faris Almaziad: Building Engineering Department, Imam Abdulrahman Bin Faisal University, 2835 King Faisal Road, Dammam 34212, Saudi Arabia

Energies, 2022, vol. 16, issue 1, 1-22

Abstract: Delays in completing the construction of oil and gas projects impact the production, sustainability, reliability, and revenues of the company, which result in market share losses in the long term. This research aimed to determine, evaluate, and rank the root causes of schedule delays in oil and gas pipeline projects in Saudi Arabia. Forty-seven different causes were identified firstly from a wide-ranging literature review and then finalized through conducting interviews with two local experts. These causes were ranked by distributing and analyzing questionnaires on the topic. Client-related materials, delays in materials and equipment delivery, permit approval, delays in subcontractor work, and delays in preparing and approving engineering drawings were found to be the top five major causes affecting oil and gas pipeline construction projects. From the initial analyses, it was observed that an adversarial relationship was apparent as the results indicated that the parties tended to blame each other for the delays. The sub-causes of the initial five causes were identified and root cause analysis was performed. A delay in the material and equipment delivery category had the most weighted sub-causes; hence, it is of high importance to mitigate it. Further recommendations were made for different delay causes.

Keywords: oil and gas pipeline project; delay factor; root causes (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/16/1/283/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/1/283/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2022:i:1:p:283-:d:1016447

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:16:y:2022:i:1:p:283-:d:1016447