Dynamic Optimal Power Dispatch in Unbalanced Distribution Networks with Single-Phase Solar PV Units and BESS
Jordan Radosavljević,
Aphrodite Ktena (),
Milena Gajić,
Miloš Milovanović and
Jovana Živić
Additional contact information
Jordan Radosavljević: Faculty of Technical Sciences, University of Priština in Kosovska Mitrovica, 38220 Kosovska Mitrovica, Serbia
Aphrodite Ktena: General Department, National and Kapodistrian University of Athens, Evripos Campus, 34400 Evia, Greece
Milena Gajić: Technical Faculty in Bor, University of Belgrade, 19210 Bor, Serbia
Miloš Milovanović: Faculty of Technical Sciences, University of Priština in Kosovska Mitrovica, 38220 Kosovska Mitrovica, Serbia
Jovana Živić: Faculty of Technical Sciences, University of Priština in Kosovska Mitrovica, 38220 Kosovska Mitrovica, Serbia
Energies, 2023, vol. 16, issue 11, 1-19
Abstract:
Battery energy storage systems (BESSs) are a promising solution for increasing efficiency and flexibility of distribution networks (DNs) with a significant penetration level of photovoltaic (PV) systems. There are various issues related to the optimal operation of DNs with integrated PV systems and BESS that need to be addressed to maximize DN performance. This paper deals with day-ahead optimal active–reactive power dispatching in unbalanced DNs with integrated single-phase PV generation and BESS. The objectives are the minimization of cost for electricity, energy losses in the DN, and voltage unbalance at three-phase load buses by optimal management of active and reactive power flows. To solve this highly constrained non-linear optimization problem, a hybrid particle swarm optimization with sigmoid-based acceleration coefficients (PSOS) and a chaotic gravitational search algorithm (CGSA)called the PSOS-CGSA algorithm is proposed. A scenario-based approach encompassing the Monte Carlo simulation (MCS) method with a simultaneous backward reduction algorithm is used for the probabilistic assessment of the uncertainty of PV generation and power of loads. The effectiveness of the proposed procedure is evaluated through aseries test cases in a modified IEEE 13-bus feeder. The simulation results show that the proposed approach enables a large reduction in daily costs for electricity, as well as a reduction in expected daily energy losses in the DN by 22% compared to the base case without BESS while ensuring that the phase voltage unbalance rate (PVUR) is below the maximum limit of 2% for all three-phase buses in the DN.
Keywords: distribution network; PV generation; battery energy storage; optimal power dispatch; uncertainty; scenario reduction (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/1996-1073/16/11/4356/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/11/4356/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2023:i:11:p:4356-:d:1157111
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().