Numerical Investigation of the Influence of Roof-Cutting Parameters on the Stability of Top Coal Gob-Side Entry Retaining by Roof Pre-Fracturing in Ultra-Thick Coal Seam
Yongkang Yang (),
Peipeng Gao,
Chao Zhang and
Chenlong Wang
Additional contact information
Yongkang Yang: Key Laboratory of In-Situ Property-Improving Mining of Ministry of Education, Taiyuan University of Technology, Taiyuan 030024, China
Peipeng Gao: Key Laboratory of In-Situ Property-Improving Mining of Ministry of Education, Taiyuan University of Technology, Taiyuan 030024, China
Chao Zhang: Key Laboratory of In-Situ Property-Improving Mining of Ministry of Education, Taiyuan University of Technology, Taiyuan 030024, China
Chenlong Wang: College of Mechanical and Vehicle Engineering, Taiyuan University of Technology, Taiyuan 030024, China
Energies, 2023, vol. 16, issue 12, 1-20
Abstract:
Gob-side entry retaining by roof cutting, a pillarless mining technique, plays a critical role in maintaining continuous production, rapid connection, and enhancing the coal recovery rate in fully mechanized top coal caving working faces. This technique stands as a sustainable development method in coal mining. The present research, set against the backdrop of the Yitang Coal Mine 100602 top coal gob-side entry retaining by roof cutting, investigates the influence of roof-cutting borehole depth, borehole dip angle, mining height, and coal seam thickness on stability in an ultra-thick coal seam under 12 distinct mining conditions. A typical model of overburden structure post-roof pre-splitting was established to study the failure mechanism of the top coal roof. The results reveal that the dip angle and depth of the roof pre-fracturing borehole significantly impact the movement characteristics of the overlying strata. Optimal conditions are found when the dip angle and depth of the roof pre-fracturing borehole, the mining height, and the top coal thickness are 10°, 16 m, 4 m, and 4 m, respectively. Under these circumstances, the load transfer from the goaf to the gob-side entry can be effectively intercepted, mitigating the influence of roof fracture activities on the top coal gob-side entry. Field measurements confirm that suitable anchor-net support can stabilize the roof’s rock structure. This research underpins the significance of roof pre-fracturing for the promotion and application of top coal gob-side entry retaining by roof cutting in ultra-thick coal seams.
Keywords: top coal gob-side entry; roof pre-fracturing; roof-cutting parameters; ultra-thick coal seam (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1996-1073/16/12/4788/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/12/4788/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2023:i:12:p:4788-:d:1173886
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().