Field Test Method and Equivalence Analysis of Delay Characteristics of DC Electronic Current Transformer

Mengmeng Zhu, Hongda Tang, Zhaolei He, Yaohua Liao, Biao Tang, Qunqun Zhang, Hongchun Shu, Yaqi Deng, Fang Zeng and Pulin Cao ()
Additional contact information
Mengmeng Zhu: Electric Power Research Institute of Yunnan Power Grid Co., Ltd., Kunming 650200, China
Hongda Tang: Faculty of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500, China
Zhaolei He: Measurement Verification Department of Measurement Center of Yunnan Power Grid Co., Ltd., Kunming 650200, China
Yaohua Liao: Electric Power Research Institute of Yunnan Power Grid Co., Ltd., Kunming 650200, China
Biao Tang: Electric Power Research Institute of Yunnan Power Grid Co., Ltd., Kunming 650200, China
Qunqun Zhang: Faculty of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500, China
Hongchun Shu: Faculty of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500, China
Yaqi Deng: Faculty of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500, China
Fang Zeng: Faculty of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500, China
Pulin Cao: Faculty of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500, China

Energies, 2023, vol. 16, issue 15, 1-10

Abstract: DC electronic current transformer is the data source of the system control and protection device, so its measurement delay has always been concerned. In this paper, the DC current transformer is modelled equivalently and the key factors affecting the delay of shunt and the remote module are analyzed. A field test method for the delay characteristics of the DC electronic current transformer is proposed. Moreover, a complex multi-state large current generator and integrated test system are developed. On the basis of the IEC 60044-8 standard transmission protocol, the accuracy of standard signal acquisition with the shunt is better than 0.2%. The maximum output current of the established testing system is 600 A. Based on the field test in an actual HVDC project, transient step and various frequency signal components are applied for analyzing.

Keywords: DC electronic current transformer; group delay; field test (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/16/15/5727/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/15/5727/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2023:i:15:p:5727-:d:1207563

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:16:y:2023:i:15:p:5727-:d:1207563