Switching Operations in 110 kV Networks in the Context of Synchro-Check and Mitigation of Switching Stress by Utilizing Proper Control of Renewables and Energy Storages
Krzysztof Łowczowski (),
Piotr Miller,
Magdalena Udzik and
Daria Złotecka
Additional contact information
Krzysztof Łowczowski: Institute of Electrical Power Engineering, Poznan University of Technology, Piotrowo 3A, 61-138 Poznan, Poland
Piotr Miller: Department of Electrical Power Engineering, Lublin University of Technology, Nadbystrzycka 38A, 20-618 Lublin, Poland
Magdalena Udzik: Institute of Electrical Power Engineering, Poznan University of Technology, Piotrowo 3A, 61-138 Poznan, Poland
Daria Złotecka: Institute of Electrical Power Engineering, Poznan University of Technology, Piotrowo 3A, 61-138 Poznan, Poland
Energies, 2023, vol. 16, issue 18, 1-21
Abstract:
Synchro-check (SC) relays are devices that control synchronization between different fragments of power system networks. Synchronism is monitored by controlling the voltage amplitude, angle, and frequency differences. The goal of monitoring is to avoid dangerous transients after the circuit breaker (CB) closing, which occur when the differences between the voltage, angle, and frequency at both sides of the CB are above the threshold. Although the idea of SC is straightforward, one needs to realize that blocking of the CB closing may cause even more severe issues, i.e., the deterioration of power system stability and safety. The conflicting goals of the switching operation result in many different interpretations, regarding the recommended settings and utilization of the SC relays in different locations of power system networks. The paper presents considerations connected with switching operations in power systems, in particular, in 110 kV networks. Different problems connected with switching operations are highlighted and described. Moreover, the switching-relevant parameters and switching constraints are provided. Further, the simulation results connected with switching operations are presented, the realistic possible voltage and angle differences before switching operations are provided, and the impacts of mitigation measures—renewables and energy storage—are estimated. Finally, the proposed procedures and algorithms of switching stress mitigation are provided.
Keywords: energy storage; switching operation; synchro-check; synchronism; renewable; PV plant (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/1996-1073/16/18/6434/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/18/6434/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2023:i:18:p:6434-:d:1233593
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().