Risk Assessment of Power Supply Security Considering Optimal Load Shedding in Extreme Precipitation Scenarios
Gang Zhou,
Jianxun Shi,
Bingjing Chen,
Zhongyi Qi and
Licheng Wang ()
Additional contact information
Gang Zhou: Jiaxing Power Supply Company of State Grid, Jiaxing 314000, China
Jianxun Shi: Jiaxing Power Supply Company of State Grid, Jiaxing 314000, China
Bingjing Chen: Jiaxing Heng-Chuang Electric Power Group Limited Bochuang Materials Branch, Jiaxing 314000, China
Zhongyi Qi: Jiaxing Power Supply Company of State Grid, Jiaxing 314000, China
Licheng Wang: School of Information Engineering, Zhejiang University of Technology, Hangzhou 310023, China
Energies, 2023, vol. 16, issue 18, 1-17
Abstract:
Extreme rainfall may induce flooding failures of electricity facilities, which poses power systems in a risk of power supply interruption. To quantitatively estimate the risk of power system operation under extreme rainfall, a multi-scenario stochastic risk assessment method was proposed. First, a scenario generation scheme considering waterlogged faults of power facilities was constructed based on the storm water management model (SWMM) and the extreme learning machine method. These scenarios were merged with several typical scenario sets for further processing. The outage of power facilities will induce power flow transfer which may consequently lead to transmission lines’ thermal limit violation. Semi-invariant and Gram–Charlier level expansion methods were adopted to analytically depict the probability density function and cumulative probability function of each line’s power flow. The optimal solution was performed by a particle swarm algorithm to obtain proper load curtailment at each bus, and consequently, the violation probability of line thermal violations can be controlled within an allowable range. The volume of load curtailment as well as their importance were considered to quantitatively assess the risk of power supply security under extreme precipitation scenarios. The effectiveness of the proposed method was verified in case studies based on the Southeast Australia Power System. Simulation results indicated that the risk of load shedding in extreme precipitation scenarios can be quantitatively estimated, and the overload probability of lines can be controlled within the allowable range through the proposed optimal load shedding scheme.
Keywords: extreme precipitation; load curtailment; power supply security; risk assessment; stochastic power flow (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1996-1073/16/18/6660/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/18/6660/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2023:i:18:p:6660-:d:1241601
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().