Analysis of the System Impact upon Thyristor Controlled Series Capacitor Relocation Due to Changes in the Power System Environment

Hyun-Keun Ku, Hyuk-Il Kwon, Ji-Young Song, Seung-Chan Oh and Jeong-Hoon Shin ()
Additional contact information
Hyun-Keun Ku: CFI Research Center, KEPCO Research Institute (KEPRI), Daejeon 34056, Republic of Korea
Hyuk-Il Kwon: CFI Research Center, KEPCO Research Institute (KEPRI), Daejeon 34056, Republic of Korea
Ji-Young Song: CFI Research Center, KEPCO Research Institute (KEPRI), Daejeon 34056, Republic of Korea
Seung-Chan Oh: CFI Research Center, KEPCO Research Institute (KEPRI), Daejeon 34056, Republic of Korea
Jeong-Hoon Shin: CFI Research Center, KEPCO Research Institute (KEPRI), Daejeon 34056, Republic of Korea

Energies, 2023, vol. 16, issue 2, 1-12

Abstract: Owing to geographical and political influences, Korea has an independent electric power system and the highest density of electric power facilities in the world. Large-scale base power generation complexes are located in non-metropolitan coastal areas, while the most expensive combined cycle power plants are operating or under construction in the metropolitan areas, which have the largest electricity demand. It has become difficult to secure a site for power plants, and the existing power transmission network is insufficient because of the additional construction of generators in existing power generation complexes, the increase in capacity of facilities, and the rapid increase in new and renewable energy. In particular, the East Coast region has a problem of transient stability for this reason, which is being addressed in advance through power generation restrictions. In addition, TCSC (Thyristor Controlled Series Capacitor) is installed and operated to expand the capacity of existing power transmission lines and improve stability in the failures of nearby high-voltage lines until new transmission lines that take more than 10 years are installed to resolve power generation restrictions. However, after the construction of a new transmission line, the efficiency of the existing TCSC is degraded, and for efficient use, it is necessary to rearrange the installation location to utilize the optimal TCSC according to changes in the configuration of the nearby power system. Moreover, a detailed analysis is needed on whether the TCSC designed according to the existing grid configuration exhibits accurate control performance even after the relocation and whether it interferes with nearby generators. In addition to the dynamic performance based on real-time simulations, it is necessary to study the control performance and interaction for this power electronic equipment. This study verified the need to change controller parameters, the interaction effect with nearby generators for stable operation, and the system effect of TCSC relocation using the same replica controller as the actual field controller, as well as RTDS (Real Time Digital Simulation) simulating the entire power transmission system.

Keywords: TCSC; RTDS; replica controller; SSTI; damping analysis (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/16/2/722/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/2/722/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2023:i:2:p:722-:d:1028487

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:16:y:2023:i:2:p:722-:d:1028487