Barriers and Prospects for the Development of Renewable Energy Sources in Poland during the Energy Crisis
Hubert Kryszk,
Krystyna Kurowska (),
Renata Marks-Bielska,
Stanisław Bielski and
Bartłomiej Eźlakowski
Additional contact information
Hubert Kryszk: Department of Land Management and Geographic Information Systems, Faculty of Geoengineering, University of Warmia and Mazury in Olsztyn, Prawocheńskiego 15, 10-695 Olsztyn, Poland
Krystyna Kurowska: Department of Land Management and Geographic Information Systems, Faculty of Geoengineering, University of Warmia and Mazury in Olsztyn, Prawocheńskiego 15, 10-695 Olsztyn, Poland
Renata Marks-Bielska: Faculty of Economic Sciences, University of Warmia and Mazury in Olsztyn, Oczapowskiego 4, 10-719 Olsztyn, Poland
Stanisław Bielski: Faculty of Agriculture and Forestry, University of Warmia and Mazury in Olsztyn, Oczapowskiego 8, 10-718 Olsztyn, Poland
Bartłomiej Eźlakowski: Department of Land Management and Geographic Information Systems, Faculty of Geoengineering, University of Warmia and Mazury in Olsztyn, Prawocheńskiego 15, 10-695 Olsztyn, Poland
Energies, 2023, vol. 16, issue 4, 1-17
Abstract:
Europe is currently facing the potentially biggest energy crisis in history. There are many reasons for this, and the current geopolitical situation makes it clear that we are being forced to take immediate action to ensure sufficient energy supplies to consumers. Until recently, the European Union was dependent on Russian energy resources (mainly oil and gas). For many years, the EU countries had been shutting down their own production and importing much cheaper raw material from Russia. The threat of a blackout is becoming increasingly possible. European governments are preparing businesses and households for the energy crisis in various ways, but there is also a great deal of mobilization to accelerate the development of renewable energy sources (RES). The aim of this study was to identify the barriers and prospects for RES development in Poland in the current geopolitical conditions. The reasons for insufficient grid HC were analyzed. Additionally, the article aimed to assess the prospects for solar energy development in Poland. Wind power was discussed only in general terms because the development of wind farms is inhibited by the regulatory framework. Particular attention was paid to hosting capacity (HC) and the condition of the power infrastructure as the main determinants of RES development in Poland. Numerous documents developed by power companies and government agencies responsible for implementing and managing energy in Poland were analyzed. Special attention was paid to legal regulations and the need for legislative changes. As a country, Poland has one of the highest growth rates in photovoltaic (PV) installations. The forecasts for increasing HC, as a prerequisite for RES development in Poland, are not promising.
Keywords: connection to the power grid; energy crisis; legal requirements; photovoltaic power stations; renewable energy sources (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (9)
Downloads: (external link)
https://www.mdpi.com/1996-1073/16/4/1724/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/4/1724/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2023:i:4:p:1724-:d:1062890
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().