Optimal Power Scheduling and Techno-Economic Analysis of a Residential Microgrid for a Remotely Located Area: A Case Study for the Sahara Desert of Niger
Issoufou Tahirou Halidou (),
Harun Or Rashid Howlader (),
Mahmoud M. Gamil,
M. H. Elkholy and
Tomonobu Senjyu
Additional contact information
Issoufou Tahirou Halidou: Graduate School of Engineering and Science, University of the Ryukyus, 1 Senbaru, Nakagami-Gun, Nishihara-Cho, Okinawa 903-0213, Japan
Harun Or Rashid Howlader: Hawai’i Natural Energy Institute, University of Hawai’i at Manoa, Honolulu, HI 96822, USA
Mahmoud M. Gamil: Graduate School of Engineering and Science, University of the Ryukyus, 1 Senbaru, Nakagami-Gun, Nishihara-Cho, Okinawa 903-0213, Japan
M. H. Elkholy: Graduate School of Engineering and Science, University of the Ryukyus, 1 Senbaru, Nakagami-Gun, Nishihara-Cho, Okinawa 903-0213, Japan
Tomonobu Senjyu: Graduate School of Engineering and Science, University of the Ryukyus, 1 Senbaru, Nakagami-Gun, Nishihara-Cho, Okinawa 903-0213, Japan
Energies, 2023, vol. 16, issue 8, 1-23
Abstract:
The growing demand for electricity and the reconstruction of poor areas in Africa require an effective and reliable energy supply system. The construction of reliable, clean, and inexpensive microgrids, whether isolated or connected to the main grid, has great importance in solving energy supply problems in remote desert areas. It is a complex interaction between the level of reliability, economical operation, and reduced emissions. This paper investigates the establishment of an efficient and cost-effective microgrid in a remote area located in the Djado Plateau, which lies in the Sahara Ténéré desert in northeastern Niger. Three cases are presented and compared to find the best one in terms of low costs. In case 1, the residential area is supplied by PVs and a battery energy storage system (BESS), while in the second case, PVs, a BESS, and a diesel generator (DG) are utilized to supply the load. In the third case, the grid will take on load-feeding responsibilities alongside PVs, a BESS, and a DG (used only in scenario 1 during the 2 h grid outage). The central objective is to lower the cost of the proposed microgrid. Among the three cases, case 3, scenario 2 has the lowest LCC, but implementing it is difficult because of the nature of the site. The results show that case 2 is the best in terms of total life cycle cost (LCC) and no grid dependency, as the annual total LCC reaches about $2,362,997. In this second case, the LCC is 11.19% lower compared to the first case and 5.664% lower compared to the third case, scenario 1.
Keywords: microgrid; mixed-integer linear programming (MILP); power scheduling; optimal sizing; grid outage (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/1996-1073/16/8/3471/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/8/3471/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2023:i:8:p:3471-:d:1124400
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().