Performance Analysis of a 300 MW Coal-Fired Power Unit during the Transient Processes for Peak Shaving
Chunlai Yang (),
Xiaoguang Hao,
Qijun Zhang,
Heng Chen,
Zhe Yin and
Fei Jin
Additional contact information
Chunlai Yang: State Grid Hebei Energy Technology Service Co., Ltd., Shijiazhuang 210023, China
Xiaoguang Hao: State Grid Hebei Energy Technology Service Co., Ltd., Shijiazhuang 210023, China
Qijun Zhang: School of Energy Power and Mechanical Engineering, North China Electric Power University, Beijing 102206, China
Heng Chen: School of Energy Power and Mechanical Engineering, North China Electric Power University, Beijing 102206, China
Zhe Yin: State Grid Hebei Energy Technology Service Co., Ltd., Shijiazhuang 210023, China
Fei Jin: State Grid Hebei Energy Technology Service Co., Ltd., Shijiazhuang 210023, China
Energies, 2023, vol. 16, issue 9, 1-17
Abstract:
A simulation model based on Dymola modelling was developed to investigate the dynamic characteristics of automatic generation control (AGC) for variable-load thermal power units in this study. Specifically, a 300 MW unit from a power plant in northern China was used to verify the model’s validity in steady-state processes and to analyze the behavior of the main thermal parameters under different rates of load changes. The economic performance of the unit under different rates of load changes is also analyzed by combining the economic indexes of “two regulations” in the power grid. Results indicate that as the rate of load changes increases, boiler output, main steam temperature, reheat steam temperature, main steam pressure, and working temperatures of various equipment fluctuate more intensely. Specifically, at a rate of load reduction of 2.0% P e MW/min, the maximum deviation of the main steam temperature can reach 7.6 °C, with the screen-type superheater experiencing the largest heat exchange. To achieve a balance between safety and economics for the unit, the rate of load raising should not exceed 1.2% P e MW/min, and the rate of load reduction should not exceed 0.8% P e MW/min. This paper applies the covariance index and AGC assessment index of the thermal power unit load control system to the established dynamic simulation model to supplement the AGC assessment index in the “two regulations”, and to provide a flexible and reasonable system evaluation result for field operators to refer to, so as to improve the economics of the system on the basis of safety.
Keywords: coal-fired power plant; power regulation; transient simulation; dynamic characteristics; performance optimization (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/1996-1073/16/9/3727/pdf (application/pdf)
https://www.mdpi.com/1996-1073/16/9/3727/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:16:y:2023:i:9:p:3727-:d:1133844
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().