A Bi-Level Optimized Dispatching Method for Grids with High Penetration of New Energy Considering Ancillary Service Costs

Renfeng Tao (), Fengting Li and Yangqing Li
Additional contact information
Renfeng Tao: Engineering Research Center for Renewable Energy Power Generation and Grid Technology, Xinjiang University, Ministry of Education, Urumqi 830047, China
Fengting Li: Engineering Research Center for Renewable Energy Power Generation and Grid Technology, Xinjiang University, Ministry of Education, Urumqi 830047, China
Yangqing Li: Hebei Provincial Key Laboratory of Power Transmission Equipment Security Defense, North China Electric Power University, Baoding 071003, China

Energies, 2024, vol. 17, issue 13, 1-21

Abstract: To address the issue of high auxiliary service costs caused by the grid connection of new energy generation, a dual layer optimization scheduling method for high penetration new energy power grids is proposed, taking into account the auxiliary service costs of grid connection. The correlation between the output fluctuations and load fluctuations of new energy generation is analyzed, and a calculation model for auxiliary service costs caused by grid connection of new energy generation is established. Taking into account the timescale division requirements for grid energy trading and auxiliary service market transactions, a new high penetration energy grid two-level optimization scheduling model is established. The upper level scheduling model aims to minimize the sum of grid energy procurement costs and auxiliary service costs caused by new energy generation and completes the optimization scheduling of the grid for several hours. The lower level scheduling model aims to closely follow the upper level scheduling plan for new energy power plants/groups. Optimization and scheduling of the power grid for tens of minutes is completed, taking into account the balanced allocation of wind and solar losses among various power plants within the new energy power plant group. The simulation results show that the method proposed in this paper can reduce the energy transaction costs and auxiliary service transaction costs of the power grid during low and peak load periods.

Keywords: bi-level optimization; ancillary service; double-layer dispatching framework; orderly dynamic aggregation; virtual power plants (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2024
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/17/13/3270/pdf (application/pdf)
https://www.mdpi.com/1996-1073/17/13/3270/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:17:y:2024:i:13:p:3270-:d:1428264

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:17:y:2024:i:13:p:3270-:d:1428264