Two-Stage Optimal Configuration Strategy of Distributed Synchronous Condensers at the Sending End of Large-Scale Wind Power Generation Bases

Lang Zhao (), Zhidong Wang, Yizheng Li, Xueying Wang, Zhiyun Hu and Yunpeng Xiao
Additional contact information
Lang Zhao: State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China
Zhidong Wang: State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China
Yizheng Li: State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China
Xueying Wang: State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China
Zhiyun Hu: Economic and Technological Research Institute, State Grid Xinjiang Electric Power Co., Ltd., Urumqi 830063, China
Yunpeng Xiao: Department of Electric Power Engineering, Xi’an Jiaotong University, Xi’an 710061, China

Energies, 2024, vol. 17, issue 18, 1-25

Abstract: The transmission end of large-scale wind power generation bases faces challenges such as high AC-DC coupling strength, low system inertia, and weak voltage support capabilities. Deploying distributed synchronous condensers (SCs) within and around wind farms can effectively provide transient reactive power support, enhance grid system inertia at the transmission end, and improve dynamic frequency support capabilities. However, the high investment and maintenance costs of SCs hinder their large-scale deployment, necessitating the investigation of optimal SC configuration strategies at critical nodes in the transmission grid. Initially, a node inertia model was developed to identify weaknesses in dynamic frequency support, and a critical inertia constraint based on node frequency stability was proposed. Subsequently, a multi-timescale reactive power response model was formulated to quantify the impact on short-circuit ratio improvement and transient overvoltage suppression. Finally, a two-stage optimal configuration strategy for distributed SCs at the transmission end was proposed, considering dynamic frequency support and transient voltage stability. In the first stage, the optimal SC configuration aimed to maximize system inertia improvement per unit investment to meet dynamic frequency support requirements. In the second stage, the configuration results from the first stage were adjusted by incorporating constraints for enhancing the multiple renewable short-circuit ratio (MRSCR) and suppressing transient overvoltage. The proposed model was validated using the feeder grid of a large energy base in western China. The results demonstrate that the optimal configuration scheme effectively suppressed transient overvoltage at the generator end and significantly enhanced the system’s dynamic frequency support strength.

Keywords: large-scale wind power generation bases; dynamic frequency support; transient voltage stabilization; distributed synchronous condenser; optimal configuration strategy (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/17/18/4748/pdf (application/pdf)
https://www.mdpi.com/1996-1073/17/18/4748/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:17:y:2024:i:18:p:4748-:d:1483741

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:17:y:2024:i:18:p:4748-:d:1483741