EconPapers    
Economics at your fingertips  
 

MCDM Optimization-Based Development of a Plus-Energy Microgrid Architecture for University Buildings and Smart Parking

Mahmoud Ouria, Alexandre F. M. Correia, Pedro Moura, Paulo Coimbra and Aníbal T. de Almeida ()
Additional contact information
Mahmoud Ouria: Institute of Systems and Robotics, Department of Electrical and Computer Engineering, University of Coimbra, 3030-290 Coimbra, Portugal
Alexandre F. M. Correia: Institute of Systems and Robotics, Department of Electrical and Computer Engineering, University of Coimbra, 3030-290 Coimbra, Portugal
Pedro Moura: Institute of Systems and Robotics, Department of Electrical and Computer Engineering, University of Coimbra, 3030-290 Coimbra, Portugal
Paulo Coimbra: Institute of Systems and Robotics, Department of Electrical and Computer Engineering, University of Coimbra, 3030-290 Coimbra, Portugal
Aníbal T. de Almeida: Institute of Systems and Robotics, Department of Electrical and Computer Engineering, University of Coimbra, 3030-290 Coimbra, Portugal

Energies, 2025, vol. 18, issue 14, 1-37

Abstract: This paper presents a multi-criteria decision-making (MCDM) approach for optimizing a microgrid system to achieve Plus-Energy Building (PEB) performance at the University of Coimbra’s Electrical Engineering Department. Using Python 3.12.8, Rhino 7, and PVsyst 8.0.1, simulations considered architectural and visual constraints, with economic feasibility assessed through a TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution) analysis. The system is projected to generate approximately 1 GWh annually, with a 98% probability of exceeding 1076 MWh based on Gaussian estimation. Consumption is estimated at 460 MWh, while a 3.8 MWh battery ensures up to 72 h of autonomy. Rooftop panels and green parking arrays, fixed at 13.5° and 59°, minimize visual impact while contributing a surplus of +160% energy injection (or a net surplus of +60% energy after self-consumption). Assuming a battery cost of EUR 200/kWh, each hour of energy storage for the building requires 61 kWh of extra capacity with a cost of 12,200 (EUR/hr.storage). Recognizing environmental variability, these figures represent cross-validated probabilistic estimates derived from both PVsyst and Monte Carlo simulation using Python, reinforcing confidence in system feasibility. A holistic photovoltaic optimization strategy balances technical, economic, and architectural factors, demonstrating the potential of PEBs as a sustainable energy solution for academic institutions.

Keywords: Plus-Energy Building; TOPSIS-MCDM and solar energy optimization; PV system design and uncertainty; battery storage systems; urban sustainability; university microgrid (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/18/14/3641/pdf (application/pdf)
https://www.mdpi.com/1996-1073/18/14/3641/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:18:y:2025:i:14:p:3641-:d:1698276

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-07-10
Handle: RePEc:gam:jeners:v:18:y:2025:i:14:p:3641-:d:1698276