A Pilot Application Study on Risk-Informed In-Service Inspection Methods for Pipelines in HPR1000 Nuclear Power Plants: A Case Study of the RCV System

Ming Wang (), Bing Zhang, Jiaoshen Xu and Sijuan Chen
Additional contact information
Ming Wang: State Key Laboratory of Nuclear Power Safety Technology and Equipment, China Nuclear Power Engineering Co., Ltd., Shenzhen 518116, China
Bing Zhang: State Key Laboratory of Nuclear Power Safety Technology and Equipment, China Nuclear Power Engineering Co., Ltd., Shenzhen 518116, China
Jiaoshen Xu: State Key Laboratory of Nuclear Power Safety Technology and Equipment, China Nuclear Power Engineering Co., Ltd., Shenzhen 518116, China
Sijuan Chen: Shenzhen Key Laboratory of Nuclear and Radiation Safety, Institute for Advanced Study in Nuclear Energy & Safety, College of Physics and Optoelectronic Engineering, Shenzhen University, Shenzhen 518060, China

Energies, 2025, vol. 18, issue 17, 1-15

Abstract: Traditional in-service inspection (ISI) methods for pipelines have certain limitations in identifying pipeline leakages. When these methods are directly applied to the ISI of Hua-long pressurized reactor (HPR1000) nuclear power plants, where the system complexity has significantly increased, they may lead to insufficient inspection efficiency and an extremely heavy workload. In this study, based on the framework of typical risk-informed analysis methods for nuclear power plants in the industry and integrating domestic engineering practical experience, an optimized ISI model for pipelines in HPR1000 nuclear power plants was constructed, and a pilot application was carried out on the chemical and volume control system (RCV) of the primary circuit. The inspection strategy was optimized through a series of steps, including determining the analysis scope, conducting pipe segment failure analysis, constructing a risk matrix, selecting inspection elements, and assessing risk impacts. Case studies showed that the risk-informed in-service inspection (RI-ISI) method successfully classified over 3000 welds in the RCV system based on risk levels (high, medium, low). After optimization, 16 low-risk welds (risk level 7) and one of the two medium-risk welds (risk level 4) that originally required volumetric inspection were exempted from inspection. Quantitative risk analysis confirmed that the increments in core damage frequency (CDF) and large early-release frequency (LERF) caused by this optimization were far below the regulatory limits. This method significantly reduces the inspection burden of medium- and low-risk pipelines while ensuring that high-risk areas receive priority attention, providing important technical support for the safe and efficient operation and maintenance of HPR1000 and subsequent third-generation nuclear power units.

Keywords: risk-informed (RI); in-service inspection (ISI); probabilistic safety assessment (PSA); HPR1000; nuclear power plant safety (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/18/17/4753/pdf (application/pdf)
https://www.mdpi.com/1996-1073/18/17/4753/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:18:y:2025:i:17:p:4753-:d:1743862

Access Statistics for this article

Energies is currently edited by Ms. Cassie Shen

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-09-11
Handle: RePEc:gam:jeners:v:18:y:2025:i:17:p:4753-:d:1743862