Technoeconomic Feasibility of Wind and Solar Generation for Off-Grid Hyperscale Data Centres

William Rollinson, Andrew Urquhart and Murray Thomson ()
Additional contact information
William Rollinson: CREST (Centre for Renewable Energy Systems Technology), Wolfson School of Mechanical, Electrical and Manufacturing Engineering, Loughborough University, Ashby Road, Loughborough LE11 3TU, UK
Andrew Urquhart: CREST (Centre for Renewable Energy Systems Technology), Wolfson School of Mechanical, Electrical and Manufacturing Engineering, Loughborough University, Ashby Road, Loughborough LE11 3TU, UK
Murray Thomson: CREST (Centre for Renewable Energy Systems Technology), Wolfson School of Mechanical, Electrical and Manufacturing Engineering, Loughborough University, Ashby Road, Loughborough LE11 3TU, UK

Energies, 2025, vol. 18, issue 2, 1-20

Abstract: As a global community our use of data is increasing exponentially with emerging technologies such as artificial intelligence (AI), leading to a vast increase in the energy demand for data centres worldwide. Delivering this increased energy demand is a global challenge, which the rapid growth of renewable generation deployment could solve. For many data centre giants such as Google, Amazon, and Microsoft this has been the solution to date via power purchase agreements (PPAs). However, insufficient investment in grid infrastructure globally has both renewable generation developers and data centre developers facing challenges to connect to the grid. This paper considers the costs and carbon emissions associated with stand-alone hybrid renewable and gas generation microgrids that could be deployed either before a grid connection is available, or to allow the data centre to operate entirely off-grid. WindPRO 4.0 software is used to find optimal configurations with wind and solar generation, backed up by battery storage and onsite gas generation. The results show that off-grid generation could provide lower cost and carbon emissions for each of Europe’s data centre hotspots in Frankfurt, London, Amsterdam, Paris, and Dublin. This paper compares each generation configuration to grid equivalent systems and an onsite gas-only generation solution. The results showed that each hybrid renewable generation configuration had a reduced levelized cost of energy ( LCOE ) and reduced CO 2 eq emissions compared to that of its grid and gas-only equivalent. Previous literature does not consider the economic implications caused by a mismatch between generation and consumption. Therefore, this paper introduces a new metric to evaluate and compare the economic performance of each microgrid, the levelized cost of energy utilised ( LCOE u) which gives the levelized cost of energy for a given microgrid considering only the energy which is consumed by the data centre. The LCOE u across all sites was found to be between 70 and 102 GBP/MWh with emissions between 0.021 and 0.074 tCO 2 eq/MWh.

Keywords: data centre; renewable energy; solar; wind; battery storage; microgrid (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2025
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1996-1073/18/2/382/pdf (application/pdf)
https://www.mdpi.com/1996-1073/18/2/382/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:18:y:2025:i:2:p:382-:d:1569315

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:18:y:2025:i:2:p:382-:d:1569315