EconPapers    
Economics at your fingertips  
 

Optimal Coordination of Automatic Line Switches for Distribution Systems

Ming-Ta Yang and Jyh-Cherng Gu
Additional contact information
Ming-Ta Yang: Department of Electrical Engineering, St. John’s University, 499, Sec. 4, Tam King Road, Tamsui District, New Taipei City 25135, Taiwan
Jyh-Cherng Gu: Department of Electrical Engineering, National Taiwan University of Science and Technology, 43, Sec. 3, Keelung Road., Taipei 106, Taiwan

Energies, 2012, vol. 5, issue 4, 1-25

Abstract: For the Taiwan Power Company (Taipower), the margins of coordination times between the lateral circuit breakers (LCB) of underground 4-way automatic line switches and the protection equipment of high voltage customers are often too small. This could lead to sympathy tripping by the feeder circuit breaker (FCB) of the distribution feeder and create difficulties in protection coordination between upstream and downstream protection equipment, identification of faults, and restoration operations. In order to solve the problem, it is necessary to reexamine the protection coordination between LCBs and high voltage customers’ protection equipment, and between LCBs and FCBs, in order to bring forth new proposals for settings and operations. This paper applies linear programming to optimize the protection coordination of protection devices, and proposes new time current curves (TCCs) for the overcurrent (CO) and low-energy overcurrent (LCO) relays used in normally open distribution systems by performing simulations in the Electrical Transient Analyzer Program (ETAP) environment. The simulation results show that the new TCCs solve the coordination problems among high voltage customer, lateral, feeder, bus-interconnection, and distribution transformer. The new proposals also satisfy the requirements of Taipower on protection coordination of the distribution feeder automation system (DFAS). Finally, the authors believe that the system configuration, operation experience, and relevant criteria mentioned in this paper may serve as valuable references for other companies or utilities when building DFAS of their own.

Keywords: distribution feeder automation system; protection coordination; underground 4-way automatic line switch (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://www.mdpi.com/1996-1073/5/4/1150/pdf (application/pdf)
https://www.mdpi.com/1996-1073/5/4/1150/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:5:y:2012:i:4:p:1150-1174:d:17330

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jeners:v:5:y:2012:i:4:p:1150-1174:d:17330