Application of Habitat Evaluation Procedure with Quantifying the Eco-Corridor in the Process of Environmental Impact Assessment
Jiyoung Choi and
Sangdon Lee
Additional contact information
Jiyoung Choi: Department of Environmental Science and Engineering, Ewha Womans University, Seoul 03760, Korea
Sangdon Lee: Department of Environmental Science and Engineering, Ewha Womans University, Seoul 03760, Korea
IJERPH, 2019, vol. 16, issue 8, 1-14
Abstract:
In contrast to other fields, environmental protection (e.g., habitat protection) often fails to include quantitative evaluation as part of the existing environmental impact assessment (EIA) process, and therefore the EIA is often a poor forecasting tool, which makes selecting a reasonable plan of action difficult. In this study, we used the Habitat Evaluation Procedure (HEP) to quantify the long-term effects of a road construction project on an ecosystem. The water deer ( Hydropotes inermis ) was selected as the species of study since it uses an optimum habitat; water deer habitat data were collected on vegetation cover, stream water density, geographic contour, land use class, and road networks. The Habitat Suitability Index (HSI) and Cumulative Habitat Unit (CHU) values for the water deer were estimated to investigate the major land cover classes, the national river systems, and vegetation cover. Results showed that the environmental impact in the road construction project area would result in a net ecological loss value of 1211 without installation of an eco-corridor, which reduced to 662 with an eco-corridor, providing a 55% increase in the net value after 50 years of the mitigation plan. Comparing the 13 proposed ecological mitigation corridors, the corridor that would result in the highest net increase (with an increase of 69.5), was corridor #4, which was regarded as the most appropriate corridor to properly connect water deer habitat. In sum, the study derived the net increase in quantitative values corresponding with different mitigation methods over time for a road construction project; this procedure can be effectively utilized in the future to select the location of ecological corridors while considering the costs of constructing them.
Keywords: habitat evaluation procedure; ecological evaluation; road construction; roadkill; eco-corridor (search for similar items in EconPapers)
JEL-codes: I I1 I3 Q Q5 (search for similar items in EconPapers)
Date: 2019
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.mdpi.com/1660-4601/16/8/1437/pdf (application/pdf)
https://www.mdpi.com/1660-4601/16/8/1437/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jijerp:v:16:y:2019:i:8:p:1437-:d:225058
Access Statistics for this article
IJERPH is currently edited by Ms. Jenna Liu
More articles in IJERPH from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().