EconPapers    
Economics at your fingertips  
 

The Dynamic Response of Nitrogen Transformation to the Dissolved Oxygen Variations in the Simulated Biofilm Reactor

Qianqian Lu, Nannan Zhang, Chen Chen, Miao Zhang, Dehua Zhao and Shuqing An
Additional contact information
Qianqian Lu: School of Life Science, Nanjing University, Nanjing 210023, China
Nannan Zhang: School of Life Science, Nanjing University, Nanjing 210023, China
Chen Chen: School of Life Science, Nanjing University, Nanjing 210023, China
Miao Zhang: School of Life Science, Nanjing University, Nanjing 210023, China
Dehua Zhao: School of Life Science, Nanjing University, Nanjing 210023, China
Shuqing An: School of Life Science, Nanjing University, Nanjing 210023, China

IJERPH, 2021, vol. 18, issue 7, 1-18

Abstract: Lab-scale simulated biofilm reactors, including aerated reactors disturbed by short-term aeration interruption (AE-D) and non-aerated reactors disturbed by short-term aeration (AN-D), were established to study the stable-state (SS) formation and recovery after disturbance for nitrogen transformation in terms of dissolved oxygen (DO), removal efficiency (RE) of NH 4 + -N and NO 3 ? -N and activity of key nitrogen-cycle functional genes amo A and nir S (RNA level abundance, per ball). SS formation and recovery of DO were completed in 0.56–7.75 h after transition between aeration (Ae) and aeration stop (As). In terms of pollutant REs, new temporary SS formation required 30.7–52.3 h after Ae and As interruptions, and seven-day Ae/As interruptions required 5.0% to 115.5% longer recovery times compared to one-day interruptions in AE-D and AN-D systems. According to amo A activity, 60.8 h were required in AE-D systems to establish new temporary SS after As interruptions, and RNA amo A copies (copy number/microliter) decreased 88.5%, while 287.2 h were required in AN-D systems, and RNA amo A copies (copy number/microliter) increased 36.4 times. For nir S activity, 75.2–85.8 h were required to establish new SSs after Ae and As interruptions. The results suggested that new temporary SS formation and recovery in terms of DO, pollutant REs and amo A and nir S gene activities could be modelled by logistic functions. It is concluded that temporary SS formation and recovery after Ae and As interruptions occurred at asynchronous rates in terms of DO, pollutant REs and amo A and nir S gene activities. Because of DO fluctuations, the quantitative relationship between gene activity and pollutant RE remains a challenge.

Keywords: simulated biofilm reactor; stable state; nitrogen cycle; dissolved oxygen; gene activity (search for similar items in EconPapers)
JEL-codes: I I1 I3 Q Q5 (search for similar items in EconPapers)
Date: 2021
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1660-4601/18/7/3633/pdf (application/pdf)
https://www.mdpi.com/1660-4601/18/7/3633/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jijerp:v:18:y:2021:i:7:p:3633-:d:527694

Access Statistics for this article

IJERPH is currently edited by Ms. Jenna Liu

More articles in IJERPH from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jijerp:v:18:y:2021:i:7:p:3633-:d:527694