Identifying and Evaluating the Essential Factors Affecting the Incidence of Site Accidents Caused by Human Errors in Industrial Parks Construction Projects
Adel Rafieyan,
Hadi Sarvari () and
Daniel W. M. Chan
Additional contact information
Adel Rafieyan: Department of Civil Engineering, Najafabad Branch, Islamic Azad University, Najafabad 85141-43131, Iran
Hadi Sarvari: Department of Civil Engineering, Isfahan (Khorasgan) Branch, Islamic Azad University, Isfahan 81551-39998, Iran
Daniel W. M. Chan: Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong, China
IJERPH, 2022, vol. 19, issue 16, 1-15
Abstract:
In terms of safety management, the implementation of industrial parks construction projects (IPCPs) is incredibly challenging due to the special working conditions and the specific type of use of the buildings. On the other hand, the possibility of causing accidents in these areas based on human errors is high and important for project execution due to the risks of human errors and financial losses. Therefore, this study tries to fill this existing research gap by identifying and evaluating the effective key factors leading to the occurrence of construction accidents caused by human errors in the development of IPCPs. After a holistic review of the reported literature, four rounds of fuzzy Delphi survey were launched to capture the individual opinions and feedback from various project experts. Accordingly, 41 key factors affecting human errors in the implementation of industrial parks construction projects in Iran were identified and classified into nine main groups of wrong actions, observations/interpretations, planning/processes, equipment, organization, individual activities, environmental conditions, rescue, and technology. Then, the step-wise weight assessment ratio analysis (SWARA) method was adopted to rate and rank the identified factors of human errors in the implementation of IPCPs in Iran. The research findings indicated that among the elicited factors, time factor (0.1226), delayed interpretation (0.1080), and incorrect diagnosis/prediction (0.0990) are the three most crucial factors leading to human errors in the implementation of IPCPs in Iran. The results of this research study have provided various major project stakeholders with an effective decision-aid tool to make better-informed decisions in managing and reducing the occurrence of construction site accidents particularly caused by human errors associated with IPCPs.
Keywords: construction projects; construction accidents; human error; industrial area; fuzzy Delphi method; SWARA (search for similar items in EconPapers)
JEL-codes: I I1 I3 Q Q5 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.mdpi.com/1660-4601/19/16/10209/pdf (application/pdf)
https://www.mdpi.com/1660-4601/19/16/10209/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jijerp:v:19:y:2022:i:16:p:10209-:d:890524
Access Statistics for this article
IJERPH is currently edited by Ms. Jenna Liu
More articles in IJERPH from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().