Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration
Yanbo Ma,
Kaiyue Liu,
Zheng Li and
Xiang Chen ()
Additional contact information
Yanbo Ma: School of Management Science and Engineering, Shandong University of Finance and Economics, Jinan 250014, China
Kaiyue Liu: School of Management Science and Engineering, Shandong University of Finance and Economics, Jinan 250014, China
Zheng Li: School of Management Science and Engineering, Shandong University of Finance and Economics, Jinan 250014, China
Xiang Chen: Department of Nuclear Medicine, Qilu Hospital of Shandong University, Jinan 250012, China
IJERPH, 2022, vol. 19, issue 20, 1-20
Abstract:
This paper proposes an operating room (OR) scheduling model to assign a group of next-day patients to ORs while adhering to OR availability, priorities, and OR overtime constraints. Existing studies usually consider OR scheduling problems by ignoring the influence of uncertainties in surgery durations on the OR assignment. In this paper, we address this issue by formulating accurate patient waiting times as the cumulative sum of uncertain surgery durations from the robust discrete approach point of view. Specifically, by considering the patients’ uncertain surgery duration, we formulate the robust OR scheduling model to minimize the sum of the fixed OR opening cost, the patient waiting penalty cost, and the OR overtime cost. Then, we adopt the box uncertainty set to specify the uncertain surgery duration, and a robustness coefficient is introduced to control the robustness of the model. This resulting robust model is essentially intractable in its original form because there are uncertain variables in both the objective function and constraint. To make this model solvable, we then transform it into a Mixed Integer Linear Programming (MILP) model by employing the robust discrete optimization theory and the strong dual theory. Moreover, to evaluate the reliability of the robust OR scheduling model under different robustness coefficients, we theoretically analyze the constraint violation probability associated with overtime constraints. Finally, an in-depth numerical analysis is conducted to verify the proposed model’s effectiveness and to evaluate the robustness coefficient’s impact on the model performance. Our analytical results indicate the following: (1) With the robustness coefficient, we obtain the tradeoff relationship between the total management cost and the constraint violation probability, i.e., a smaller robustness coefficient yields remarkably lower total management cost at the expense of a noticeably higher constraint violation probability and vice versa. (2) The obtained total management cost is sensitive to small robustness coefficient values, but it hardly changes as the robustness coefficient increases to a specific value. (3) The obtained total management cost becomes increasingly sensitive to the perturbation factor with the decrease in constraint violation probability.
Keywords: OR scheduling model; uncertainsurgery duration; constraint violation probability; patients’ waiting time; total OR management cost (search for similar items in EconPapers)
JEL-codes: I I1 I3 Q Q5 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1660-4601/19/20/13685/pdf (application/pdf)
https://www.mdpi.com/1660-4601/19/20/13685/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jijerp:v:19:y:2022:i:20:p:13685-:d:949884
Access Statistics for this article
IJERPH is currently edited by Ms. Jenna Liu
More articles in IJERPH from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().