Research on Coal Mine Building Compliance Inspection System Based on Accident Causation and BIM in China
Xinchun Li,
Xiaolin Zhang,
Quanlong Liu (),
Yueqian Zhang,
Xiao Gu and
Zunxiang Qiu
Additional contact information
Xinchun Li: School of Economics and Management, China University of Mining and Technology, Xuzhou 221116, China
Xiaolin Zhang: School of Economics and Management, China University of Mining and Technology, Xuzhou 221116, China
Quanlong Liu: School of Economics and Management, China University of Mining and Technology, Xuzhou 221116, China
Yueqian Zhang: School of Economics and Management, China University of Mining and Technology, Xuzhou 221116, China
Xiao Gu: School of Economics and Management, China University of Mining and Technology, Xuzhou 221116, China
Zunxiang Qiu: School of Economics and Management, China University of Mining and Technology, Xuzhou 221116, China
IJERPH, 2022, vol. 19, issue 24, 1-14
Abstract:
Coal mine construction projects have high risks, and non-compliant designs generated in the design stage will have adverse effects on subsequent construction and production stages. Therefore, it is of great importance to conduct effective preconstruction compliance inspections on coal mine construction designs. To make the compliance check of coal mine building design more rapid and effective, and to reduce the risks arising from the design phase, this study built a compliance inspection system for coal mine building design from the causes of coal mine accidents, using the Word2Vec word similarity calculation method and BIM platform secondary development technology. The system was tested and was found to be able to detect a 92.82% non-compliant component rate where the correct inspection rate was 97.68%. In addition, the inspection time for a single component was only 0.23 s. The construction of the compliance inspection system based on accident causes has changed the extensive inspection mode in the traditional manual model inspection, and the inspection no longer depends on the experience of inspectors, thus improving the efficiency and accuracy of coal mine building model inspection. The inspection focuses on the building elements with high risks, which achieves the purpose of risk control in the design stage.
Keywords: coal mine safety construction; BIM; Word2Vec; compliance check; accident causation (search for similar items in EconPapers)
JEL-codes: I I1 I3 Q Q5 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/1660-4601/19/24/16466/pdf (application/pdf)
https://www.mdpi.com/1660-4601/19/24/16466/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jijerp:v:19:y:2022:i:24:p:16466-:d:997234
Access Statistics for this article
IJERPH is currently edited by Ms. Jenna Liu
More articles in IJERPH from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().