EconPapers    
Economics at your fingertips  
 

Agent-Based Modeling of Construction Firms’ Organizational Behavior in Public Tenders

Valeriya Gladkikh () and Aleksandr Alekseev ()
Additional contact information
Valeriya Gladkikh: Department of Construction Engineering and Materials Science, Perm National Research Polytechnic University, 614990 Perm, Russia
Aleksandr Alekseev: Administrative Directorate for Organization of Scientific Research, Perm National Research Polytechnic University, 614990 Perm, Russia

JRFM, 2023, vol. 16, issue 2, 1-19

Abstract: A key problem of construction firms’ management and economy is organization of effective participation in public tenders. The direct executor, who determines the price of the contract, may be interested in obtaining as many contracts as possible. It means that his strategic behavior in tender may be to undervalue each individual offer. At the same time, such a strategy can be a source of risk of project loss because the actual costs may be lower than the price of the contract won. The management of the construction organization is not interested in this. On the other hand, overpricing strategy may lead to a reduction in the number of contracts won, which may not seem effective either for the head or for the executor of such an organization. The article discusses whether the profits of a construction firm can increase by using a more precise method of calculating the estimated cost. The second question is—which staff of a construction firm will benefit from using such methods? The aim of this work is to test these hypotheses with the instrumentality of agent-based modeling. Profit values of construction firms were obtained by the computer simulation of the construction firms’ strategic behavior in public tenders. Results of 1500 computer experiments are presented as a decision tree. It can be seen that when using a more precise method, construction firms win tenders almost two times less often. However, they incur losses many times less than with an inaccurate method. If a construction firm made a profit from the contracts won, the profit margin was almost always greater when using the more precise method. Moreover, the results of game-theoretic modeling are given. Values of the objective functions of the executor and head of the construction firm were obtained, taking into account the reward for contracts won and penalty for miscalculating the cost of work. It has been proved that using more precise methods for calculating the estimated cost is beneficial to both the head and the executor. It can be concluded that both hypotheses were confirmed and a precise method for calculating the cost increases the efficiency of a construction firm.

Keywords: construction firms; tenders; organizational behavior; multi-agent system; agent-based modeling; computer simulation (search for similar items in EconPapers)
JEL-codes: C E F2 F3 G (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/1911-8074/16/2/105/pdf (application/pdf)
https://www.mdpi.com/1911-8074/16/2/105/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jjrfmx:v:16:y:2023:i:2:p:105-:d:1062645

Access Statistics for this article

JRFM is currently edited by Ms. Chelthy Cheng

More articles in JRFM from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jjrfmx:v:16:y:2023:i:2:p:105-:d:1062645