Continuous Long Time Series Monitoring of Urban Construction Land in Supporting the SDG 11.3.1—A Case Study of Nanning, Guangxi, China
Ziyan Ling,
Weiguo Jiang (),
Yuan Lu,
Yurong Ling,
Ze Zhang and
Chaoming Liao
Additional contact information
Ziyan Ling: Beijing Key Laboratory for Remote Sensing of Environment and Digital Cities, Faculty of Geographical Science, Beijing Normal University, Beijing 100875, China
Weiguo Jiang: Beijing Key Laboratory for Remote Sensing of Environment and Digital Cities, Faculty of Geographical Science, Beijing Normal University, Beijing 100875, China
Yuan Lu: College of Geography and Planning, Nanning Normal University, Nanning 530001, China
Yurong Ling: College of Geography and Planning, Nanning Normal University, Nanning 530001, China
Ze Zhang: Beijing Key Laboratory for Remote Sensing of Environment and Digital Cities, Faculty of Geographical Science, Beijing Normal University, Beijing 100875, China
Chaoming Liao: College of Natural Resources and Surveying and Mapping, Nanning Normal University, Nanning 530001, China
Land, 2023, vol. 12, issue 2, 1-18
Abstract:
Enhancing the spatio-temporal dynamic monitoring of the construction land of emerging major cities provides the basis for understanding the effects of human activities on the earth’s ecological environment changes, which is regarded as an important way to improve human wellbeing and to achieve the UN SDGs. This paper, which uses Nanning as an example, adopts 30 m annual remote sensing land cover datasets from 1990–2021 to elaborately analyze the temporal evolution and spatial expansion of construction land and to evaluate the sustainable development level based on SDG 11.3.1. The conclusions of this paper are as follows: (1) For Nanning City, during 1990–2021, construction land area increased from 54.77 km 2 to 326.33 km 2 —a nearly five-fold increase. Spreading expansion and finger-like expansion along roads played a leading role during the development of the construction land in Nanning. Liangqing and Yongning are the future directions of urban development. The LCRPGR of Nanning declined with one peak period around 1995, and the LCRPGR was relatively stable with a high intensity of land use. (2) For the other emerging major cities, continuous long duration data are more suitable for urban construction land monitoring compared with traditional sparse time-series monitoring. The rich information derived from continuous long duration data can help decision makers to formulate and implement more comprehensive measures. The research paradigm adopted in this study can be applied in other cities. The newly developed urban districts will have foreseeable high sustainable development risks, and urban development strategies at the international, national, and urban levels could reduce those risks and promote the realization of UN SDGs from different angles and with different intensities.
Keywords: urban construction land (UCL); continuous long time series; SDG 11.3.1; Nanning City (search for similar items in EconPapers)
JEL-codes: Q15 Q2 Q24 Q28 Q5 R14 R52 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2073-445X/12/2/452/pdf (application/pdf)
https://www.mdpi.com/2073-445X/12/2/452/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jlands:v:12:y:2023:i:2:p:452-:d:1064078
Access Statistics for this article
Land is currently edited by Ms. Carol Ma
More articles in Land from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().