A Global Neighborhood with Hill-Climbing Algorithm for Fuzzy Flexible Job Shop Scheduling Problem
Juan Carlos Seck-Tuoh-Mora (),
Nayeli Jazmín Escamilla-Serna,
Leonardo Javier Montiel-Arrieta,
Irving Barragan-Vite and
Joselito Medina-Marin
Additional contact information
Juan Carlos Seck-Tuoh-Mora: Área Académica de Ingeniería, Instituto de Ciencias Básicas e Ingeniería, Universidad Autónoma del Estado de Hidalgo, Carr. Pachuca-Tulancingo km. 4.5, Pachuca 42184, Hidalgo, Mexico
Nayeli Jazmín Escamilla-Serna: Área Académica de Ingeniería, Instituto de Ciencias Básicas e Ingeniería, Universidad Autónoma del Estado de Hidalgo, Carr. Pachuca-Tulancingo km. 4.5, Pachuca 42184, Hidalgo, Mexico
Leonardo Javier Montiel-Arrieta: Área Académica de Ingeniería, Instituto de Ciencias Básicas e Ingeniería, Universidad Autónoma del Estado de Hidalgo, Carr. Pachuca-Tulancingo km. 4.5, Pachuca 42184, Hidalgo, Mexico
Irving Barragan-Vite: Área Académica de Ingeniería, Instituto de Ciencias Básicas e Ingeniería, Universidad Autónoma del Estado de Hidalgo, Carr. Pachuca-Tulancingo km. 4.5, Pachuca 42184, Hidalgo, Mexico
Joselito Medina-Marin: Área Académica de Ingeniería, Instituto de Ciencias Básicas e Ingeniería, Universidad Autónoma del Estado de Hidalgo, Carr. Pachuca-Tulancingo km. 4.5, Pachuca 42184, Hidalgo, Mexico
Mathematics, 2022, vol. 10, issue 22, 1-13
Abstract:
The Flexible Job Shop Scheduling Problem (FJSSP) continues to be studied extensively to test new metaheuristics and because of its closeness to current production systems. A variant of the FJSSP uses fuzzy processing times instead of fixed times. This paper proposes a new algorithm for FJSSP with fuzzy processing times called the global neighborhood with hill-climbing algorithm (GN-HC). This algorithm performs solution exploration using simple operators concurrently for global search neighborhood handling. For local search, random restart hill-climbing is applied at each solution to find the best machine for each operation. For the selection of operations in hill climbing, a record of the operations defining the fuzzy makespan is employed to use them as a critical path. Finally, an estimation of the crisp makespan with the longest processing times in hill climbing is made to improve the speed of the GN-HC. The GN-HC is compared with other recently proposed methods recognized for their excellent performance, using 6 FJSSP instances with fuzzy times. The obtained results show satisfactory competitiveness for GN-HC compared to state-of-the-art algorithms. The GN-HC implementation was performed in Matlab and can be found on GitHub (check Data Availability Statement at the end of the paper).
Keywords: job shop scheduling; fuzzy processing times; global search; hill climbing; critical path (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2227-7390/10/22/4233/pdf (application/pdf)
https://www.mdpi.com/2227-7390/10/22/4233/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:10:y:2022:i:22:p:4233-:d:971104
Access Statistics for this article
Mathematics is currently edited by Ms. Emma He
More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().