An Effective 4–Phased Framework for Scheduling Job-Shop Manufacturing Systems Using Weighted NSGA-II
Aidin Delgoshaei (),
Mohd Khairol Anuar Bin Mohd Ariffin and
Zulkiflle B. Leman
Additional contact information
Aidin Delgoshaei: Department of Mechanical and Manufacturing Engineering, Universiti Putra Malaysia, Serdang 43400, SL, Malaysia
Mohd Khairol Anuar Bin Mohd Ariffin: Department of Mechanical and Manufacturing Engineering, Universiti Putra Malaysia, Serdang 43400, SL, Malaysia
Zulkiflle B. Leman: Department of Mechanical and Manufacturing Engineering, Universiti Putra Malaysia, Serdang 43400, SL, Malaysia
Mathematics, 2022, vol. 10, issue 23, 1-28
Abstract:
Improving the performance of manufacturing systems is a vital issue in today’s rival market. For this purpose, during the last decade, scientists have considered more than one objective function while scheduling a production line. This paper develops a 4-phased fuzzy framework to identify effective factors, determine their weights on multi-objective functions, and, accordingly, schedule manufacturing systems in a fuzzy environment. The aim is to optimize product completion time and operational and product defect costs in a job-shop-based multi-objective fuzzy scheduling problem. In the first and second phases of the proposed framework, it was shown that the existing uncertainty of the internal factors for the studied cases causes the weights of factors to change up to 44.5%. Then, a fuzzy-weighted NSGA-II is proposed (FW-NSGA-II) to address the developed Non-linear Fuzzy Multi-objective Dual resource-constrained scheduling problem. Comparing the outcomes of the proposed method with other solving algorithms, such as the Sine Cosine Algorithm, Simulated Annealing, Tabu Search, and TLBO heuristic, using seven series of comprehensive computational experiments, indicates the superiority of the proposed framework in scheduling manufacturing systems. The outcomes indicated that using the proposed method for the studied cases saved up to 5% in the objective function for small-scale, 11.2% for medium-scale, and 3.8% for large-scale manufacturing systems. The outcomes of this study can help production planning managers to provide more realistic schedules by considering fuzzy factors in their manufacturing systems. Further investigating the proposed method for dynamic product conditions is another direction for future research.
Keywords: product scheduling; job-shop; weighted NSGA-II; product completion time (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.mdpi.com/2227-7390/10/23/4607/pdf (application/pdf)
https://www.mdpi.com/2227-7390/10/23/4607/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:10:y:2022:i:23:p:4607-:d:994021
Access Statistics for this article
Mathematics is currently edited by Ms. Emma He
More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().