EconPapers    
Economics at your fingertips  
 

Partial Least Squares Structural Equation Modeling of Constraint Factors Affecting Project Performance in the Egyptian Building Industry

Mohammed Rady, Ahmed Farouk Kineber (), Mohammed Magdy Hamed and Ahmed Osama Daoud
Additional contact information
Mohammed Rady: Construction and Building Engineering Department, College of Engineering and Technology, Arab Academy for Science, Technology and Maritime Transport (AASTMT), B 2401 Smart Village, Giza 12577, Egypt
Ahmed Farouk Kineber: Department of Civil Engineering, College of Engineering in Al-Kharj, Prince Sattam Bin Abdulaziz University, Al-Kharj 11942, Saudi Arabia
Mohammed Magdy Hamed: Construction and Building Engineering Department, College of Engineering and Technology, Arab Academy for Science, Technology and Maritime Transport (AASTMT), B 2401 Smart Village, Giza 12577, Egypt
Ahmed Osama Daoud: Civil Engineering Department, Faculty of Engineering, The British University in Egypt (BUE), El Sherouk City, Cairo 11837, Egypt

Mathematics, 2023, vol. 11, issue 3, 1-16

Abstract: Building constraints hinder building operations from meeting a project’s time, budget, and quality objectives. For a construction project to provide satisfying results, it is essential to recognize and address such constraints early on. Unfortunately, research on the causes of building constraints and their implications for building management has been limited. Therefore, there is a pressing need to study the sources of constraints and how they impact project results. Consequently, this study addresses this gap by examining the hurdles confronting Egypt’s general building construction projects. Building constraints were identified from previous studies, which were then contextually investigated using a survey questionnaire within the Egyptian construction sector. The exploratory factor analysis (EFA) findings indicated that the constraint factors could be divided into six constructs: environment, stakeholders, regulations, policies, management, and traditional beliefs and ownership. Partial least square structural equation modeling was also utilized to create a constraint factor model. The findings demonstrated that environmental restrictions were significant obstacles to the effective execution of a project. The results of this research can assist decision makers in Egypt’s building sector in cutting costs and improving sustainability by easing the effects of limiting variables.

Keywords: constraint factors; sustainability; Egypt; building projects; PLS-SEM; EFA (search for similar items in EconPapers)
JEL-codes: C (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://www.mdpi.com/2227-7390/11/3/497/pdf (application/pdf)
https://www.mdpi.com/2227-7390/11/3/497/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jmathe:v:11:y:2023:i:3:p:497-:d:1038555

Access Statistics for this article

Mathematics is currently edited by Ms. Emma He

More articles in Mathematics from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jmathe:v:11:y:2023:i:3:p:497-:d:1038555